Loading...
HomeMy Public PortalAbout05564 O R D I N A N C E NO. 5564 AN ORDINANCE, appropriating Sixty-five Thousand Eight Hundred Dollars ($65,800.00) from the Subdistrict Planning Fund for Value Engineering services required in the design of the Fenton Interim Wastewater Treatment Plant in the Lower Meramec River Basin. (Part of Federal Project No. C-290875) WHEREAS, under the 1981 Amendments to the Clean Water Act, funding for Step 1 and Step 2 grants must be advanced by the grantee, and allowance will be made for the federal share and state share of advanced funds when the grantee receives the Step 3 Construction Grant, and WHEREAS, when this allowance is made, said funds shall be repaid to the Subdistrict Planning Fund, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Sixty-five Thousand Eight Hundred Dollars ($65,800.00) is hereby appropriated from the Subdistrict Planning Fund for Value Engineering services required in the design of the Fenton Interim Wastewater Treatment Plant in the Lower Meramec River Basin. (Part of Federal Project No. C- 290875) Section Two. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted March 28, 1984.