HomeMy Public PortalAbout05889 O R D I N A N C E NO. 5889
AN ORDINANCE, authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-480 with Russell & Axon for the
cost of continuing Step 2 engineering services for the design of
trunk sewers and facilities in the Lower Meramec River Basin -
Yarnell Creek Interceptor Sewer. (Part of Federal Project No. C-
290875).
WHEREAS, the District requires specialized consulting
assistance for said engineering services,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St.
Louis Sewer District to enter into Contract E-480 with Russell &
Axon for the cost of continuing Step 2 engineering services for
the design of trunk sewers and facilities in the Lower Meramec
River Basin - Yarnell Creek Interceptor Sewer. (Part of Federal
Project No. C-290875).
Section Two. The contract authorized in Section One of
this Ordinance shall be comprised of such terms and conditions as
are approved by the Assistant Executive Director and General
Counsel of the District.
The foregoing Ordinance was adopted February 27, 1985.