Loading...
HomeMy Public PortalAbout05889 O R D I N A N C E NO. 5889 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-480 with Russell & Axon for the cost of continuing Step 2 engineering services for the design of trunk sewers and facilities in the Lower Meramec River Basin - Yarnell Creek Interceptor Sewer. (Part of Federal Project No. C- 290875). WHEREAS, the District requires specialized consulting assistance for said engineering services, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-480 with Russell & Axon for the cost of continuing Step 2 engineering services for the design of trunk sewers and facilities in the Lower Meramec River Basin - Yarnell Creek Interceptor Sewer. (Part of Federal Project No. C-290875). Section Two. The contract authorized in Section One of this Ordinance shall be comprised of such terms and conditions as are approved by the Assistant Executive Director and General Counsel of the District. The foregoing Ordinance was adopted February 27, 1985.