Loading...
HomeMy Public PortalAbout06000 O R D I N A N C E NO. 6000 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-510 with Engineering Design and Management, Inc. for engineering services for the final design of Bruno-Canterway (FF-1) Sanitary Relief Sewer Project. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-510 with Engineering Design and Management, Inc. for engineering services for the final design of Bruno-Canterway (FF-1) Sanitary Relief Sewer Project. The foregoing Ordinance was adopted April 10, 1985.