HomeMy Public PortalAbout06000 O R D I N A N C E NO. 6000
AN ORDINANCE, authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-510 with Engineering Design and
Management, Inc. for engineering services for the final design of
Bruno-Canterway (FF-1) Sanitary Relief Sewer Project.
BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE
METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-
Treasurer are hereby authorized to enter into Contract E-510 with
Engineering Design and Management, Inc. for engineering services
for the final design of Bruno-Canterway (FF-1) Sanitary Relief
Sewer Project.
The foregoing Ordinance was adopted April 10, 1985.