HomeMy Public PortalAbout06187 O R D I N A N C E NO. 6187
AN ORDINANCE, appropriating Six Hundred Seventy One
Thousand Dollars ($671,000.00) from the Mississippi River
Construction Fund of which One Hundred Thirty Four Thousand Two
Hundred Dollars ($134,200.00) is to be used to pay the District's
twenty percent (20%) share; a grant of Three Hundred Sixty Nine
Thousand and Fifty Dollars ($369,050.00) is anticipated from the
Environmental Protection Agency, and a grant of One Hundred Sixty
Seven Thousand Seven Hundred Fifty Dollars ($167,750.00) is
anticipated from the Missouri Department of Natural Resources for
Contracts E-545 (Engineering Services during construction of the
Bissell Point Flow Meters) and C-1185 (Construction of the Bissell
Point Flow Meters), Federal Project C-290641-04.
WHEREAS, the District anticipates a fifty-five percent
(55%) grant from the Environmental Protection Agency, of the
United States to pay fifty-five percent (55%) of the cost of said
project, and
WHEREAS, a twenty-five percent (25%) grant is
anticipated from the Missouri Department of Natural Resources to
pay twenty-five percent (25%) of the cost of said project,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Thirty-four
Thousand Two Hundred Dollars ($134,200.00) is hereby appropriated
from the Mississippi River Construction Fund to pay twenty percent
(20%) of the cost for Contracts E-545 (Engineering Services during
construction of the Bissell Point Flow Meters) and C-1185
(Construction of the Bissell Point Flow Meters), Federal Project
C-290641-04.
Section Two. The anticipated grant from the
Environmental Protection Agency of the United States amounts to
Three Hundred Sixty Nine Thousand and Fifty Dollars ($369,050.00),
which will be deposited in the Mississippi River Construction Fund
and is to pay fifty-five percent (55%) of the cost for Contracts
E-545 (Engineering Services during the construction of the Bissell
Point Flow Meters) and C-1185 (Construction of the Bissell Point
Flow Meters), Federal Project C-290641-04; and said amount is
hereby appropriated to be used to make said payments when due and
payable under the terms of the contracts for said project.
Section Three. The anticipated grant from the Missouri
Department of Natural Resources amounts to One Hundred Sixty Seven
Thousand Seven Hundred Fifty Dollars ($167,750.00), which will be
deposited in the Mississippi River Construction Fund, and is to
pay twenty-five percent (25%) of the cost for Contracts E-545
(Engineering Services during construction of the Bissell Point
Flow Meters) and C-1185 (Construction of the Bissell Point Flow
Meters), Federal Project C-290641-04; and said amount is hereby
appropriated to be used to make said payments when due and payable
under the terms of the contracts for said project.
Section Four. This Ordinance, being an appropriation
Ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted September 11, 1985.