Loading...
HomeMy Public PortalAbout06190 O R D I N A N C E NO. 6190 AN ORDINANCE, transferring One Million Eight Hundred Thousand Dollars ($1,800,000.00) from the Fee Fee Sewer Extension and Improvement Fund to the Fee Fee Connection Fees Account; transferring Seven Hundred Thousand Dollars ($700,000.00) as a loan from the General Fund of the District to the Fee Fee Connection Fees Account, and providing for repayment of said loan, and appropriating Fifteen Million Eight Hundred Thousand Dollars ($15,800,000.00) from the Fee Fee Connection Fees Account of which Three Million One Hundred Sixty Thousand Dollars ($3,160,000.00) is to be used to pay the District's Twenty percent (20%) share; a grant of Eight Million Six Hundred Ninety Thousand Dollars ($8,690,000.00) is anticipated from the Environmental Protection Agency, and a grant of Three Million Nine Hundred Fifty Thousand ($3,950,000.00) is anticipated from the Missouri Department of Natural Resources for Contracts E-461 (Engineering Services during the design of the Missouri River Wastewater Treatment Plant and Missouri River Flood Plain Pump Station and Force Main), E-481 (Engineering Services during construction of the Missouri River Wastewater Treatment Plant Phase I) and C-1136 (Construction of the Missouri River Wastewater Treatment Plant Phase I), Federal Project C-291148-11. WHEREAS, the District anticipates a fifty-five percent (55%) grant from the Environmental Protection Agency of the United States to pay fifty-five percent (55%) of the cost of said project, and WHEREAS, a twenty-five percent (25%) grant is anticipated from the Missouri Department of Natural Resources to pay Twenty-five percent (25%) of the cost of said project, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Million Eight Hundred Thousand Dollars ($1,800,000.00) is hereby, transferred from the Fee Fee Sewer Extension and Improvement Fund to the Fee Fee Connection Fees Account. Section Two. The sum of Seven Hundred Thousand Dollars ($700,000.00) is hereby, transferred as a loan from the General Fund of the District to the Fee Fee Connection Fees Account. Section Three. The Director of Finance is hereby directed to repay the loan as specified in Section Two above as funds become available from the collection of connection fees in the Fee Fee Trunk Sewer Subdistrict. Section Four. The sum of Three Million One Hundred Sixty Thousand Dollars ($3,160,000.00) is hereby appropriated from the Fee Fee Connection Fees Account to pay twenty percent (20%) of the cost for Contracts E-461 (Engineering Services during the design of the Missouri River Wastewater Treatment Plant and Missouri River Flood Plain Pump Station and Force Main), E-481 (Engineering Services during construction of the Missouri River Wastewater Treatment Plant Phase I) and C-1136 (Construction of the Missouri River Wastewater Treatment Plant Phase I), Federal Project C-291148-11. 3 Section Five. The anticipated grant from the Environmental Protection Agency of the United States amounts to Eight Million six Hundred Ninety Thousand Dollars ($8,690,000.00), which will be deposited in the Fee Fee Connection Fees Account and is to pay Fifty-five percent (55%) of the cost for Contracts E-461 (Engineering Services during the design of the Missouri River Wastewater Treatment Plant and Missouri River Flood Plain Pump Station and Force Main), E-481 (Engineering Services during construction of the Missouri River Wastewater Treatment Plant Phase I) and C-1136 (Construction of the Missouri River Wastewater Treatment Plant Phase I), Federal Project C-291148-11; and said amount is hereby appropriated to be used to make said payments when due and payable under the terms of the contracts for said project. Section Six. The anticipated grant from the Missouri Department of Natural Resources amounts to Three Million Nine Hundred Fifty Thousand Dollars ($3,950,000.00), which will be deposited in the Fee Fee Connection Fees Account, and is to pay Twenty-five percent (25%) of the cost for Contracts E-461 (Engineering Services during the design of the Missouri River Wastewater Treatment Plant and Missouri River Flood Plain Pump Station and Force Main), E-481 (Engineering Services during construction of the Missouri River Wastewater Treatment Plant Phase I) and C-1136 (Construction of the Missouri River Wastewater Treatment Plant Phase I), Federal Project C-291148-11; and said amount is hereby appropriated to be used to make said payments 4 when due and payable under the terms of the contracts for said project. Section Seven. This Ordinance, being an appropriation Ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted September 11, 1985.