HomeMy Public PortalAbout06270 O R D I N A N C E NO. 6270
AN ORDINANCE, authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-548 with Campbell Design Group,
Russell & Axon and Fleming Corporation, a joint venture for the
cost of Step 2 engineering services for the design of the
Coldwater Creek Wastewater Treatment Plant Outfall Sewer (Part of
Federal Project No. C-290952).
WHEREAS, the District requires specialized consulting
assistance for said engineering services,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St.
Louis Sewer District to enter into Contract E-548 with Campbell
Design Group, Russell & Axon and Fleming Corporation, a joint
venture for the cost of Step 2 engineering services for the design
of the Coldwater Creek Wastewater Treatment Plant Outfall Sewer
(Part of Federal Project No. C-290952).
Section Two. The contract authorized in Section One
of this Ordinance shall be comprised of such terms and conditions
as are approved by the Assistant Executive Director and General
Counsel of the District.
The foregoing Ordinance was adopted December 18, 1985.