HomeMy Public PortalAbout06351 O R D I N A N C E NO. 6351
AN ORDINANCE, authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-557 with KAI Engineering, Inc.
for engineering services for the final design of #112 Holly Storm
Sewer Project.
BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE
METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-
Treasurer are hereby authorized to enter into Contract E-557 with
KAI Engineering, Inc. for engineering services for the final
design of #112 Holly Storm Sewer Project.
The foregoing Ordinance was adopted January 22, 1986.