Loading...
HomeMy Public PortalAbout06390 O R D I N A N C E NO. 6390 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-569 with Lopinot and Wideman, Inc. for engineering services for the final design of Jeffords- Bartolet Storm Sewer Project. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-569 with Lopinot and Wideman, Inc. for engineering services for the final design of Jeffords-Bartolet Storm Sewer Project. The foregoing Ordinance was adopted February 26, 1986.