Loading...
HomeMy Public PortalAbout06422 O R D I N A N C E NO. 6422 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-579 with Campbell Design Group for engineering services for the final design of Calumet 9900 Block (Phase III) Storm Sewer Project. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-579 with Campbell Design Group for engineering services for the final design of Calumet 9900 Block (Phase III) Storm Sewer Project. The foregoing Ordinance was adopted March 12, 1986.