Loading...
HomeMy Public PortalAbout06487 O R D I N A N C E NO. 6487 AN ORDINANCE, authorizing and directing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-483 with WVP Corporation for professional services required prior to and during the construction of the Fenton Interim Wastewater Treatment Plant (Part of Federal Project No. 290875-11). WHEREAS, the District requires specialized consulting assistance for said engineering services, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized and directed on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-483 with WVP Corporation for professional services required prior to and during the construction of the Fenton Interim Wastewater Treatment Plant (Part of Federal Project No. C-290875-11). Section Two. The contract authorized in Section One of this Ordinance shall be comprised of such terms and conditions as are approved by the Assistant Executive Director and General Counsel of the District. The foregoing Ordinance was adopted April 9, 1986.