Loading...
HomeMy Public PortalAbout06671 O R D I N A N C E NO. 6671 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-607 with James B. Becker Consulting Engineers for engineering services for the final design of Foote and Hammel Storm Sewer Project. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-607 with James B. Becker Consulting Engineers for engineering services for the final design of Foote and Hammel Storm Sewer Project. The foregoing Ordinance was adopted July 23, 1986.