Loading...
HomeMy Public PortalAbout06782 O R D I N A N C E NO. 6782 AN ORDINANCE, appropriating Two Hundred Three Thousand Dollars ($203,000.00) from the Mississippi River Construction Fund to be used for the construction of the Bissell Point Site Preparation (BP-1), at the Bissell Point Wastewater Treatment Plant in the City of St. Louis, Missouri. WHEREAS, the bid for the construction of said project is One Hundred Forty-nine Thousand Eight Hundred Eighty Dollars ($149,880.00), and the cost of relocation of fuel line, relocation of electrical service, relocation of telephone service, printing plans and specifications, construction application cost and allowance for construction change orders is Fifty-three Thousand One Hundred Twenty Dollars ($53,120.00). NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Three Thousand Dollars ($203,000.00) is hereby appropriated from the Mississippi River Construction Fund to be used for project costs for the construction of the Bissell Point Site Preparation (BP-1), at the Bissell Point Wastewater Treatment Plant in the City of St. Louis, Missouri. Section Two. This Ordinance, being an appropriation Ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 8, 1986.