Loading...
HomeMy Public PortalAbout06886 O R D I N A N C E NO. 6886 AN ORDINANCE, confirming a contract with Tarlton Corporation for the construction of the Bissell Point Watershed Overflow Regulation System Pumping Station Modifications No. 1 (BP-01), in the City of St. Louis, Missouri. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The contract heretofore let by the Executive Director to Tarlton Corporation as the lowest responsible bidder, for the construction of the Bissell Point Watershed Overflow Regulation System Pumping Station Modifications No. 1 (BP-01), in the City of St. Louis, Missouri, with The Metropolitan St. Louis Sewer District, pursuant to bids received and opened on the 4th day of December, 1986, and formally executed on the 16th day of December, 1986, by said contractor and by the Executive Director and the Secretary-Treasurer on behalf of the District in the following form: 2 is hereby confirmed. The foregoing Ordinance was adopted December 17, 1986.