Loading...
HomeMy Public PortalAbout06974 O R D I N A N C E NO. 6974 AN ORDINANCE, confirming a contract with J. S. Alberici Construction Co., Inc. for the construction of the Bissell Point Final Clarifier Slurry Wall (BP-5A), in the City of St. Louis, Missouri. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The contract heretofore let by the Executive Director to J. S. Alberici Construction Co., Inc. as the lowest responsible bidder, for the construction of the Bissell Point Final Clarifier Slurry Wall (BP-5A), in the City of St. Louis, Missouri, with The Metropolitan St. Louis Sewer District, pursuant to bids received and opened on the 5th day of February, 1987, and formally executed on the 24th day of February, 1987, by said contractor and by the Executive Director and the Secretary- Treasurer on behalf of the District in the following form: 2 is hereby confirmed. The foregoing Ordinance was adopted February 25, 1987.