HomeMy Public PortalAbout07627 O R D I N A N C E NO. 7627
AN ORDINANCE, authorizing and directing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St.
Louis Sewer District to enter into Contract E-645 with Booker
Associates, Inc. for engineering services during the construction
of the Meramec Bottoms Interceptor Pump Station (86143), in St.
Louis County, Missouri, with an emergency clause.
WHEREAS, the District requires specialized consulting
assistance for said engineering services.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-
Treasurer are hereby authorized and directed on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-645
with Booker Associates, Inc. for engineering services during the
construction of the Meramec Bottoms Interceptor Pump Station
(86143), in St. Louis County, Missouri.
Section Two. The contract authorized in Section One
of this Ordinance shall be comprised of such terms and conditions
as are approved by the Office of the General Counsel of the
District.
Section Three. The provisions of the Clean Water Act of
the United States of America require that this project proceed
without delay, thus creating an emergency within the meaning of
the Plan. Accordingly, this Ordinance shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted December 14, 1988.