Loading...
HomeMy Public PortalAbout07767 O R D I N A N C E NO. 7767 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-662 with Kuhlman Design Group, Inc. for engineering services for the final design of CC-12 (Turtle Creek Phase I). BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-662 with Kuhlman Design Group, Inc. for engineering services for the final design of CC-12 (Turtle Creek Phase I). Section Two. The contract authorized in Section One of this Ordinance shall be comprised of such terms and conditions as are approved by the Office of the General Counsel of the District. The foregoing Ordinance was adopted May 10, 1989.