Loading...
HomeMy Public PortalAbout07832 O R D I N A N C E NO. 7832 AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-672 with Engineering Design & Management, Inc. for engineering services for the final design of GC-4 Sanitary Relief Phase III. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-672 with Engineering Design & Management, Inc. for engineering services for the final design of GC-4 Sanitary Relief Phase III. The foregoing Ordinance was adopted July 12, 1989.