Loading...
HomeMy Public PortalAbout08147 チチテ*テ念 R D I N A N C E NO. 8147父 AN ORDINANCE, appropriating Fiftyゥtwo Thousand Dollars ($52,000.00) from the Clean Water Capital Improvement Trust Fund for Value Engineering Services for the Bissell Point Secondary Treatment Improvements Plant Control System (BPゥ10) and the Bissell Point Watershed Overflow Regulation System Control and Instrumentation System (BPゥ05): and authorizing the Executive Director and SecretaryゥTreasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract Eゥ688 with EMA, Inc. for such Value Engineering Services. WHEREAS, pursuant to Section 7.120 of the Plan of the District, the appropriation effected herein will not result in a deficit at the end of the current budget year, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: 粘ection One.・ The sum of Fiftyゥtwo Thousand Dollars ($52,000.00) is hereby appropriated from the Clean Water Capital Improvement Trust Fund for Value Engineering Services for the Bissell Point Secondary Treatment Improvements Plant Control System (BPゥ10) and the Bissell Point Watershed Overflow Regulation System Control and Instrumentation System (BPゥ05). 粘ection Two.・ The Executive Director and SecretaryェTreasurer are hereby authorized to enter into Contract Eゥ688 with EMA, Inc. for such Value Engineering Services, said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District.ワhワ・ 粘ection Three.・ This ordinance being an appropriation舶 ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 8, 1990.