Loading...
HomeMy Public PortalAbout08243ÐBlB„ÐÁÁÃ*ÔO R D I N A N C E NO. 8243•ƒ AN ORDINANCE, appropriating Forty©six Thousand Dollars ($46,000.00) from the Operation, Maintenance and Construction Improvement Fund of Gravois Creek for engineering services for the final design of Kirkwood Rd. © Commerce © Reardon Phase I (85227); and authorizing and directing the Executive Director and Secretary©Treasurer to enter into Contract E©702 with Campbell Design Group, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above©named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: ”Section One.• The sum of Forty©six Thousand Dollars ($46,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Gravois Creek for engineering services for the final design of Kirkwood Rd. © Commerce © Reardon Phase I (85227). ”Section Two.• The Executive Director and SecretaryªTreasurer are hereby authorized and directed to enter into Contract E©702 with Campbell Design Group, Inc. for engineering services for the final design of Kirkwood Rd. © Commerce © Reardon Phase I (85227); and contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. ”Section Three.• This ordinance being an appropriation ordinance, shall take effect immediately upon its enactment.ÁÁ The foregoing Ordinance was adopted December 12, 1990.