HomeMy Public PortalAbout08342 O R D I N A N C E NO. 8342
AN ORDINANCE, appropriating Fifty-one Thousand Five
Hundred Dollars ($51,500.00) from the Operation, Maintenance and
Construction Improvement Fund of the Seminary Branch of River des
Peres for engineering services for the final design of Oak Tree
Dr. Phase I (90244); and authorizing the Executive Director and
Secretary-Treasurer to enter into Contract E-712 with Clayton
Engineering Company for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that
there is an unencumbered balance in the above-named fund
sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Fifty-one Thousand Five
Hundred Dollars ($51,500.00) is hereby appropriated from the
Operation, Maintenance and Construction Improvement Fund of the
Seminary Branch of River des Peres for engineering services for
the final design of Oak Tree Dr. Phase I (90244).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized to enter into Contract E-712 with
Clayton Engineering Company for engineering services for the final
design of Oak Tree Dr. Phase I (90244); said contract to be
comprised of such terms and conditions as are approved by the
office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted April 10, 1991.