HomeMy Public PortalAbout08469 O R D I N A N C E NO. 8469
AN ORDINANCE, appropriating Forty Thousand Dollars
($40,000.00) from the Operation, Maintenance and Construction
Improvement Fund of Deer Creek for engineering services for the
final design of Woodoaks Trail - Blaytonn Storm Channel (91047);
and authorizing and directing the Executive Director and
Secretary-Treasurer to enter into Contract E-717 with Farnsworth
Reinhardt Polk, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that
there is an unencumbered balance in the above-named fund
sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Forty Thousand Dollars
($40,000.00) is hereby appropriated from the Operation,
Maintenance and Construction Improvement Fund of Deer Creek for
engineering services for the final design of Woodoaks Trail -
Blaytonn Storm Channel (91047).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized and directed to enter into
Contract E-717 with Farnsworth Reinhardt Polk, Inc. for
engineering services for the final design of Woodoaks Trail -
Blaytonn Storm Channel (91047); and contract to be comprised of
such terms and conditions as are approved by the office of the
General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted August 14, 1991.