HomeMy Public PortalAbout08499 O R D I N A N C E NO. 8499
AN ORDINANCE, appropriating Ninety-eight Thousand
Dollars ($98,000.00) from the Operation, Maintenance and
Construction Improvement Fund of Blackjack-Dellwood for
engineering services for the final design of Hallstead Storm
Channel Phase II (91068); and authorizing and directing the
Executive Director and Secretary-Treasurer to enter into Contract
E-724 with David Mason & Associates, Inc. for the aforesaid
engineering services.
WHEREAS, the Director of Finance has certified that
there is an unencumbered balance in the above-named fund
sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Ninety-eight Thousand Dollars
($98,000.00) is hereby appropriated from the Operation,
Maintenance and Construction Improvement Fund of Blackjack-
Dellwood for engineering services for the final design of
Hallstead Storm Channel Phase II (91068).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized and directed to enter into
Contract E-724 with David Mason & Associates, Inc. for engineering
services for the final design of Hallstead Storm Channel Phase II
(91068); and contract to be comprised of such terms and conditions
as are approved by the office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment
The foregoing Ordinance was adopted September 18, 1991.