HomeMy Public PortalAbout08578 O R D I N A N C E NO. 8578
AN ORDINANCE, appropriating Seventy-six Thousand
Dollars ($76,000.00) from the Operation, Maintenance and
Construction Improvement Fund of Wedgewood Creek for engineering
services for the final design of Woodsage-Sussex Sanitary Relief
(90091); and authorizing and directing the Executive Director and
Secretary-Treasurer to enter into Contract E-732 with KBR
Engineering, Inc. Associates for the aforesaid engineering
services.
WHEREAS, the Director of Finance has certified that
there is an unencumbered balance in the above-named fund
sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Seventy-six Thousand Dollars
($76,000.00) is hereby appreciated from the Operation, Maintenance
and Construction Improvement Fund of Wedgewood Creek for
engineering services for the final design of Woodsage-Sussex
Sanitary Relief (90091).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized and directed to enter into
Contract E-732 with KBR Engineering, Inc. for engineering services
for the final design of Woodsage-Sussex Sanitary Relief (90091);
and contract to be comprised of such terms and conditions as are
approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted January 8, 1992.