Loading...
HomeMy Public PortalAbout08596 O R D I N A N C E NO. 8596 AN ORDINANCE, appropriating Two Hundred Ninety-seven Thousand Dollars ($297,000.00) from the Extension and Improvement Fund of Coldwater Creek, Two Hundred Three Thousand Dollars ($203,000.00) from the Fee Fee Extension and Improvement Fund Account, Eight Thousand Dollars ($8,000.00) from the Operation, Maintenance and Construction Improvement Fund of Missouri River- Bonfils, Five Thousand Dollars ($5,000.00) from the St. Louis County Sewer Operating Fund, Ten Thousand Dollars ($10,000.00) from the Operation, Maintenance and Construction Improvement Fund of Sugar Creek and Seventy-seven Thousand Dollars ($77,000.00) from the Operation, Maintenance and Construction Improvement Fund of Meramec River Basin to be used for engineering services for the preparation of a Wastewater System Improvement Plan for Coldwater Creek, Missouri River and Meramec River Service Areas; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-735 with Burns & McDonnell for the engineering services. WHEREAS, Contract E-735 defines the scope of services, time and fees and payments for engineering services, and WHEREAS, pursuant to Section 7.120 of the Plan of the District, the appropriation effected herein will not result in a deficit at the end of the current budget year, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: 2 Section One. The sum of Two Hundred Ninety-seven Thousand Dollars ($297,000.00) from the Extension and Improvement Fund of Coldwater Creek, Two Hundred Three Thousand Dollars ($203,000.00) from the Fee Fee Extension and Improvement Fund Account, Eight Thousand Dollars ($8,000.00) from the Operation, Maintenance and Construction Improvement Fund of Missouri River- Bonfils, Five Thousand Dollars ($5,000.00) from the St. Louis County Sewer Operating Fund, Ten Thousand Dollars ($10,000.00) from the Operation, Maintenance and Construction Improvement Fund of Sugar Creek and Seventy-seven Thousand Dollars ($77,000.00) from the Operation, Maintenance and Construction Improvement Fund of Meramec River Basin is hereby appropriated for engineering services for the preparation of a Wastewater System Improvement Plan for Coldwater Creek, Missouri River and Meramec River Service Areas. Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-735 with Burns & McDonnell for engineering services for the Wastewater System Improvement Plan for Coldwater Creek, Missouri River and Meramec River Service Areas. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. 3 The foregoing Ordinance was adopted March 11, 1992.