HomeMy Public PortalAbout08649 O R D I N A N C E NO. 8649
AN ORDINANCE, appropriating Sixty-three Thousand
Dollars ($63,000.00) from the Coldwater Creek Sewer Extension and
Improvement Fund for engineering services for the final design of
Coldwater Plant Electrical and other Improvements (90118); and
authorizing the Executive Director and Secretary-Treasurer to
enter into Contract E-737 with Ross & Baruzzini, Inc. for the
aforesaid engineering services.
WHEREAS, the Director of Finance has certified that
there is an unencumbered balance in the above-named fund
sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Sixty-three Thousand Dollars
($63,000.00) is hereby appropriated from the Coldwater Creek Sewer
Extension and Improvement Fund for engineering services for the
final design of Coldwater Plant Electrical and other Improvements
(90118).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized to enter into Contract E-737 with
Ross & Baruzzini, Inc. for engineering services for the final
design of Coldwater Plant Electrical and other Improvements
(90118); and contract to be comprised of such terms and conditions
as are approved by the office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted April 29, 1992