Loading...
HomeMy Public PortalAbout08698 O R D I N A N C E NO. 8698 AN ORDINANCE, appropriating Nine Thousand Five Hundred Dollars ($9,500.00) from the Operation, Maintenance and Construction Improvement Fund of Vinita Park for engineering services for the final design of Crystal Court Storm Sewer (91042); and authorizing the Executive Director and Secretary- Treasurer to enter into Contract E-744 with James Engineering & Surveying Co., Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Nine Thousand Five Hundred Dollars ($9,500.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Vinita Park for engineering services for the final design of Crystal Court Storm Sewer (91042). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-744 with James Engineering & Surveying Co., Inc. for engineering services for the final design of Crystal Court Storm Sewer (91042); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted June 10, 1992.