HomeMy Public PortalAbout08698 O R D I N A N C E NO. 8698
AN ORDINANCE, appropriating Nine Thousand Five Hundred
Dollars ($9,500.00) from the Operation, Maintenance and
Construction Improvement Fund of Vinita Park for engineering
services for the final design of Crystal Court Storm Sewer
(91042); and authorizing the Executive Director and Secretary-
Treasurer to enter into Contract E-744 with James Engineering &
Surveying Co., Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that
there is an unencumbered balance in the above-named fund
sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Nine Thousand Five Hundred
Dollars ($9,500.00) is hereby appropriated from the Operation,
Maintenance and Construction Improvement Fund of Vinita Park for
engineering services for the final design of Crystal Court Storm
Sewer (91042).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized to enter into Contract E-744 with
James Engineering & Surveying Co., Inc. for engineering services
for the final design of Crystal Court Storm Sewer (91042); said
contract to be comprised of such terms and conditions as are
approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted June 10, 1992.