Loading...
HomeMy Public PortalAbout08699 O R D I N A N C E NO. 8699 AN ORDINANCE, appropriating a total of Three Hundred Sixty-nine Thousand Dollars ($369,000.00) to be funded as follows: Fifty-one Thousand Five Hundred Fifty Dollars ($51,550.00) from the Fenton Operating Fund, One Hundred Twenty-one Thousand Two Hundred Fifty Dollars ($121,250.00) from the Riverside Operating Fund, One Hundred Twenty-nine Thousand Dollars ($129,000.00) from the Valley Sewage Operating Fund, and Sixty-seven Thousand Two Hundred Dollars ($67,200.00) from the Operation, Maintenance and Construction Improvement Fund of Lower Meramec River Basin, to be used for the construction of the Fenton, Missouri Wastewater Treatment Plant Chlorine Facilities; and confirming a contract with C. Rallo Contracting Company, Inc. for the aforesaid construction, in compliance with Section 9.040 of the Plan of the District. WHEREAS, the bid for the aforesaid project is Three Hundred Thirty-three Thousand One Hundred Dollars ($333,100.00), and the cost of engineering, inspection, advertisement costs, and allowance for construction change orders is Thirty-five Thousand Nine Hundred Dollars ($35,900.00), and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named funds sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Three Hundred Sixty-nine 2 Thousand Dollars ($369,000.00) to be funded as follows: Fifty-one Thousand Five Hundred Fifty Dollars ($51,550.00) from the Fenton Operating Fund, One Hundred Twenty-one Thousand Two Hundred Fifty Dollars ($121,250.00) from the Riverside Operating Fund, One Hundred Twenty-nine Thousand Dollars ($129,000.00) from the Valley Sewage Operating Fund, and Sixty-seven Thousand Two Hundred Dollars ($67,200.00) from the Operation, Maintenance and Construction Improvement Fund of Lower Meramec River Basin, is hereby appropriated to be used for the construction of the Fenton, Missouri Wastewater Treatment Plant Chlorine Facilities. Section Two. The contract heretofore let by the Executive Director to C. Rallo Contracting Company, Inc. as the lowest responsible bidder for the construction of the Fenton, Missouri Wastewater Treatment Plant Chlorine Facilities, within the Metropolitan St. Louis Sewer District, pursuant to bids received and opened on the 22nd day of May, 1992 and formally executed on the 9th day of June, 1992 by said contractor and by the Executive Director and Secretary-Treasurer on behalf of the District is hereby confirmed, in compliance with Section 9.040 of the Plan of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. 3 The foregoing Ordinance was adopted June 10, 1992.