Loading...
HomeMy Public PortalAbout08817 O R D I N A N C E NO. 8817 AN ORDINANCE, appropriating Seventy-one Thousand Dollars ($71,000.00) from the Operation, Maintenance and Construction Improvement Fund of Creve Coeur-Frontenac for engineering services for the final design of Alden/Chilton Lane (90263); and authorizing the Executive Director and Secretary- Treasurer to enter into Contract E-764 with Fleming Corporation for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Seventy-one Thousand Dollars ($71,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Creve Coeur- Frontenac for engineering services for the final design of Alden/Chilton Lane (90263). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-764 with Fleming Corporation for engineering services for the final design of Alden/Chilton Lane (90263); and contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted November 18, 1992.