Loading...
HomeMy Public PortalAbout08894 O R D I N A N C E NO. 8894 AN ORDINANCE, appropriating Sixty-six Thousand Dollars ($66,000.00) from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of Gerling Place to Coldwater Creek Storm Sewer (91039); and authorizing the Executive Director and Secretary- Treasurer to enter into Contract E-773 with Russell & Axon, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Sixty-six Thousand Dollars ($66,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of Gerling Place to Coldwater Creek Storm Sewer (91039). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized and directed to enter into Contract E-773 with Russell & Axon, Inc. for engineering services for the final design of Gerling Place to Coldwater Creek Storm Sewer (91039); and contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted February 10, 1993.