Loading...
HomeMy Public PortalAbout08906 O R D I N A N C E NO. 8906 AN ORDINANCE, appropriating a total of Two Hundred Twenty Thousand Five Hundred Dollars ($220,500.00) to be funded as follows: One Hundred Eighty Thousand Five Hundred Dollars ($180,500.00) from the Bonfils Operating Fund and Forty Thousand Dollars ($40,000.00) from the Missouri Bottoms Operating Fund to be used for project costs for the installation of precast concrete bridge sections, construction of concrete footings and wingwalls, and asphalt roadway to be constructed at the Missouri River Wastewater Treatment Plant in Emergency Repair No. 18 Missouri Wastewater Treatment Plant Access Bridge (92118), in the City of Maryland Heights, Missouri; and confirming a contract with Fred Weber, Inc. for the aforesaid project, in compliance with Section 9.040 of the Plan of the District. WHEREAS, the bid for the aforesaid project is One Hundred Sixty-four Thousand Four Hundred Twenty-nine and 20/100 Dollars ($164,429.20), and the cost of engineering, inspection, construction staking, advertisement costs, easement costs, and allowance for construction change orders is Fifty-six Thousand Seventy and 80/100 Dollars ($56,070.80), and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The total sum of Two Hundred Twenty Thousand Five Hundred Dollars ($220,500.00) to be funded as follows: One Hundred Eighty Thousand Five Hundred Dollars ($180,500.00) from the Bonfils Operating Fund and Forty Thousand Dollars ($40,000.00) from the Missouri Bottoms Operating Fund is hereby appropriated to be used for project costs for the installation of precast concrete bridge sections, construction of concrete footings and wingwalls, and asphalt roadway to be constructed at the Missouri River Wastewater Treatment Plant in Emergency Repair No. 18 Missouri Wastewater Treatment Plant Access Bridge (92118), in the City of Maryland Heights, Missouri. Section Two. The contract heretofore let by the Executive Director to Fred Weber, Inc. as the lowest responsible bidder for the installation of precast concrete bridge sections, construction of concrete footings and wingwalls, and asphalt roadway to be constructed at the Missouri River Wastewater Treatment Plant (92118), in the City of Maryland Heights, Missouri, with The Metropolitan St. Louis Sewer District, pursuant to bids received and opened on the 18th day of February, 1993 and formally executed on the 9th day of March, 1993 by said contractor and by the Executive Director and Secretary-Treasurer on behalf of the District is hereby confirmed, in compliance with Section 9.040 of the Plan of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted March 10, 1993.