HomeMy Public PortalAbout08947 O R D I N A N C E NO. 8947
AN ORDINANCE, appropriating One Hundred Twenty-seven
Thousand Dollars ($127,000.00) from the Operation, Maintenance and
Construction Improvement Fund of Lower Meramec River Basin to be
used for project costs for the construction of sanitary sewers and
appurtenances in Infrastructure Repair #020P Stonetree/Pebble
Point (P-432)(P-430) 90049, in St. Louis County, Missouri; and
confirming a contract with Unnerstall Contracting Co., Ltd. for
the construction of the aforesaid sanitary sewers and
appurtenances, in compliance with Section 9.040 of the Plan of the
District.
WHEREAS, the bid for the construction of said sanitary
sewers and appurtenances is Eighty-nine Thousand Seven Hundred
Thirty-one and 50/100 Dollars ($89,731.50), and the cost of
engineering, inspection, construction staking, advertisement
costs, easement costs and allowance for construction change orders
is Thirty-seven Thousand Two Hundred Sixty-eight and 50/100
Dollars ($37,268.50).
WHEREAS, the Director of Finance has certified that
there is an unencumbered balance in the above-named fund
sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Twenty-seven
Thousand Dollars ($127,000.00) is hereby appropriated from the
Operation, Maintenance and Construction Improvement of Lower
Meramec River Basin to be used for project costs for the
construction of sanitary sewers and appurtenances in
Infrastructure Repair #020P Stonetree/Pebble Point (P-432)(P-430)
90049, in St. Louis County, Missouri.
Section Two. The contract heretofore let by the
Executive Director to Unnerstall Contracting Co., Ltd. as the
lowest responsible bidder for the construction of sanitary sewers
and appurtenances in Infrastructure Repair #020P Stonetree/Pebble
Point (P-432)(P-430) 90049, in St. Louis County, Missouri, with
The Metropolitan St. Louis Sewer District, pursuant to bids
received and opened on the 22nd day of March, 1993 and formally
executed on the 13th day of April, 1993 by said contractor and by
the Executive Director and Secretary-Treasurer on behalf of the
District is hereby confirmed, in compliance with Section 9.040 of
the Plan of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted April 14, 1993.