Loading...
HomeMy Public PortalAbout08981 O R D I N A N C E NO. 8981 AN ORDINANCE, appropriating Two Hundred Eighty Thousand Dollars ($280,000.00) from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of St. Charles Rock Rd. to Breckenridge Storm Channel and Sanitary Relief Phase I (93018); and authorizing the Executive Director and Secretary-Treasurer to enter into Contract E-785 with Booker Associates, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Eighty Thousand Dollars ($280,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of St. Charles Rock Rd. to Breckenridge Storm Channel and Sanitary Relief Phase I (93018). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized to enter into Contract E-785 with Booker Associates, Inc. for engineering services for the final design of St. Charles Rock Rd. to Breckenridge Storm Channel and Sanitary Relief Phase I (93018); said contract to be comprised of such terms and conditions as are approved by the office of the 2 General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. 3 The foregoing Ordinance was adopted May 12, 1993.