Loading...
HomeMy Public PortalAbout09251 O R D I N A N C E NO. 9251 AN ORDINANCE, appropriating Two Hundred Eighty-one Thousand Six Hundred Twenty-five Dollars ($281,625,00) from the Sanitary Replacement Fund to be used for project costs for the construction of a sheet pile wall, rock blanket slope protection, and appurtenances in Infrastructure Repair #103 (Jana Ln.) 93111, in the City of Florissant, Missouri; and confirming a contract with Tarlton Corporation for the aforesaid construction, in compliance with Section 9.040 of the Plan of the District. WHEREAS, the bid for the construction of said sheet pile wall, rock blanket slope protection, and appurtenances is Two Hundred Twenty-five Thousand Nine Hundred Eighty-one and 62/100 Dollars ($225,981.62), and the cost of engineering, inspection, construction staking, advertisement costs, and allowance for construction change orders is Fifty-five Thousand Six Hundred Forty-three and 38/100 Dollars ($55,643.38), and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorization herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Eighty-one Thousand Six Hundred Twenty-five Dollars ($281,625.00) is hereby appropriated from the Sanitary Replacement Fund to be used for project costs for the construction of a sheet pile wall, rock blanket slope protection, and appurtenances in Infrastructure Repair #103 (Jana Ln.) 93111, in the City of Florissant, Missouri. Section Two. The contract heretofore let by the Executive Director to Tarlton Corporation as the lowest responsible bidder for the construction of a sheet pile wall, rock blanket slope protection, and appurtenances in Infrastructure Repair #103 (Jana Ln.) 93111, in the City of Florissant, Missouri, with The Metropolitan St. Louis Sewer District, pursuant to bids received and opened on the 25th day of May, 1994 and formally executed on the 7th day of June, 1994 by said contractor and by the Executive Director and Secretary-Treasurer on behalf of the District is hereby confirmed, in compliance with Section 9.040 of the Plan of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted June 8, 1994.