Loading...
HomeMy Public PortalAbout09298 O R D I N A N C E NO. 9298 AN ORDINANCE, confirming a contract with Schuster Engineering, Inc. for the construction, rebuilding and/or replacing inlets, manholes, inlet manholes and replacing sewer pipe in Infrastructure Repair #123 (Maintenance) 94059, in the City of Kirkwood and unincorporated St. Louis County, Missouri, in compliance with Section 9.040 of the Plan of the District. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The contract heretofore let by the Executive Director to Schuster Engineering, Inc. for the construction, rebuilding and/or replacing inlets, manholes, inlet manholes and replacing sewer pipe in Infrastructure Repair #123 (Maintenance) 94059, in the City of Kirkwood and unincorporated St. Louis County, Missouri, with The Metropolitan St. Louis Sewer District, pursuant to bids received and opened on the 14th day of July, 1994 and formally executed on the 9th day of August, 1994 by said contractor and by the Executive Director and Secretary-Treasurer on behalf of the District is hereby confirmed, in compliance with Section 9.040 of the Plan of the District. The foregoing Ordinance was adopted August 10, 1994.