HomeMy Public PortalAbout09312
O R D I N A N C E NO. 9312
AN ORDINANCE, confirming a contract with Schuster Engineering, Inc.
for the construction, rebuilding and/or replacing inlets, manholes, inlet
manholes and replacing sewer pipe in Infrastructure Repair #105 (Maintenance)
93113, in the Cities of Berkeley, Ferguson, Florissant, Hazelwood and St. John,
Missouri, in compliance with Section 9.040 of the Plan of the District.
BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST.
LOUIS SEWER DISTRICT:
Section One. The contract heretofore let by the Executive Director
to Schuster Engineering, Inc. for the construction, rebuilding and/or replacing
inlets, manholes, inlet manholes and replacing sewer pipe in Infrastructure
Repair #105 (Maintenance) 93113, in the Cities of Berkeley, Ferguson,
Florissant, Hazelwood and St. John, Missouri, with The Metropolitan St. Louis
Sewer District, pursuant to bids received and opened on the 1st day of August,
1994 and formally executed on the 9th day of August, 1994 by said contractor
and by the Executive Director and Secretary-Treasurer on behalf of the District
is hereby confirmed, in compliance with Section 9.040 of the Plan of the
District.
The foregoing Ordinance was adopted August 10, 1994.