HomeMy Public PortalAbout09371 O R D I N A N C E NO. 9371
AN ORDINANCE, appropriating Eighty-five Thousand Dollars
($85,000.00) from the Operation, Maintenance and Construction Improvement Fund
of Clayton Central for engineering services for the final design of East
Clayton Central Phase V (94053); and authorizing the Executive Director and
Secretary-Treasurer to enter into Contract E-809 with Kuhlmann Design Group,
Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
uncumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE
METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Eighty-five Thousand Dollars ($85,000.00)
is hereby appropriated from the Operation, Maintenance and Construction
Improvement Fund of Clayton Central for engineering services for the final
design of East Clayton Central Phase V (94053).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized to enter into Contract E-809 with Kuhlmann Design Group, Inc.
for engineering services for the final design of East Clayton Central Phase V
(94053); said contract to be comprised of such terms and conditions as are
approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 12, 1994.