Loading...
HomeMy Public PortalAbout09706 O R D I N A N C E NO. 9706 AN ORDINANCE, appropriating Nineteen Thousand Dollars ($19,000.00) from the Operation, Maintenance and Construction Improvement Fund of Sugar Creek for engineering services for the final design of Old Big Bend and Craig Road Storm Sewer (94096); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-838 with Woolpert Consultants for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Nineteen Thousand Dollars ($19,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Sugar Creek for engineering services for the final design of Old Big Bend and Craig Road Storm Sewer (94096). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-838 with Woolpert Consultants for engineering services for the final design of Old Big Bend and Craig Road Storm Sewer (94096); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 12, 1995.