HomeMy Public PortalAbout09706 O R D I N A N C E NO. 9706
AN ORDINANCE, appropriating Nineteen Thousand Dollars
($19,000.00) from the Operation, Maintenance and Construction
Improvement Fund of Sugar Creek for engineering services for the
final design of Old Big Bend and Craig Road Storm Sewer (94096);
and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-838 with Woolpert Consultants for the aforesaid
engineering services.
WHEREAS, the Director of Finance has certified that there
is an unencumbered balance in the above-named fund sufficient to
pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Nineteen Thousand Dollars
($19,000.00) is hereby appropriated from the Operation, Maintenance
and Construction Improvement Fund of Sugar Creek for engineering
services for the final design of Old Big Bend and Craig Road Storm
Sewer (94096).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St.
Louis Sewer District to enter into Contract E-838 with Woolpert
Consultants for engineering services for the final design of Old
Big Bend and Craig Road Storm Sewer (94096); said contract to be
comprised of such terms and conditions as are approved by the
office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 12, 1995.