Loading...
HomeMy Public PortalAbout09840 O R D I N A N C E NO. 9840 AN ORDINANCE, appropriating Two Hundred Thousand Dollars ($200,000.00) from the General Fund of the District for the installation, operation and maintenance of streamflow gauges in Caulks Creek, Kiefer Creek, Gravois Creek, Coldwater Creek, Fee Fee Creek, Fishpot Creek, Mattese Creek, Maline Creek, and the University City Branch of River des Peres in order to provide the District with data to complete the watershed master plan; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the United States Department of the Interior (U.S. Geological Survey) for the installation, operation, and maintenance of said streamflow gauges. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Thousand Dollars ($200,000.00) is hereby appropriated from the General Fund of the District for the installation, operation, and maintenance of streamflow gauges in Caulks Creek, Kiefer Creek, Gravois Creek, Coldwater Creek, Fee Fee Creek, Fishpot Creek, Mattese Creek, Maline Creek, and the University City Branch of River des Peres in order to provide the District with data to complete the watershed master plan. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the United States Department of the Interior (U.S. Geological Survey) whereby the United States Department of the Interior (U.S. Geological Survey) will install, operate, and maintain streamflow gauges in Caulks Creek, Kiefer Creek, Gravois Creek, Coldwater Creek, Fee Fee Creek, Fishpot Creek, Mattese Creek, Maline Creek, and the University City Branch of River des Peres in order to provide the District with data to complete the watershed master plan, said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted April 18, 1996.