HomeMy Public PortalAbout09840 O R D I N A N C E NO. 9840
AN ORDINANCE, appropriating Two Hundred Thousand Dollars ($200,000.00)
from the General Fund of the District for the installation, operation and maintenance of
streamflow gauges in Caulks Creek, Kiefer Creek, Gravois Creek, Coldwater Creek, Fee Fee
Creek, Fishpot Creek, Mattese Creek, Maline Creek, and the University City Branch of River
des Peres in order to provide the District with data to complete the watershed master plan;
and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan
St. Louis Sewer District to enter into a contract with the United States Department of the
Interior (U.S. Geological Survey) for the installation, operation, and maintenance of said
streamflow gauges.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Two Hundred Thousand Dollars ($200,000.00) is
hereby appropriated from the General Fund of the District for the installation, operation, and
maintenance of streamflow gauges in Caulks Creek, Kiefer Creek, Gravois Creek, Coldwater
Creek, Fee Fee Creek, Fishpot Creek, Mattese Creek, Maline Creek, and the University City
Branch of River des Peres in order to provide the District with data to complete the watershed
master plan.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
the United States Department of the Interior (U.S. Geological Survey) whereby the United
States Department of the Interior (U.S. Geological Survey) will install, operate, and maintain
streamflow gauges in Caulks Creek, Kiefer Creek, Gravois Creek, Coldwater Creek, Fee Fee
Creek, Fishpot Creek, Mattese Creek, Maline Creek, and the University City Branch of River
des Peres in order to provide the District with data to complete the watershed master plan,
said contract to be comprised of such terms and conditions as are approved by the office of
the General Counsel of the District
Section Three. This ordinance, being an appropriation ordinance, shall take
effect immediately upon its enactment.
The foregoing Ordinance was adopted April 18, 1996.