HomeMy Public PortalAbout09841 O R D I N A N C E NO. 9841
AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-854 with Sabur
Surveying & Engineering, Inc. for engineering services for the final design of Phase III Digital
Mapping (Field Investigation & Verification) (96071).
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-854
with Sabur Surveying & Engineering, Inc. for engineering services for the Phase III Digital
Mapping (Field Investigation & Verification) (96071).
Section Two. The contract authorized in Section One of this ordinance shall be
comprised of such terms and conditions as are approved by the office of the General Counsel
of the District.
The foregoing Ordinance was adopted April 18, 1996.