Loading...
HomeMy Public PortalAbout09927 O R D I N A N C E NO. 9927 AN ORDINANCE, appropriating Two Hundred Ten Thousand Dollars ($210,000.00) from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of Upper Coldwater Sanitary Relief Section D (I-70 to Guthrie) (91094); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-860 with Stock & Associates for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Ten Thousand Dollars ($210,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of Upper Coldwater Sanitary Relief Section D (I-70 to Guthrie) (91094). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-860 with Stock & Associates for engineering services for the final design of Upper Coldwater Sanitary Relief Section D (I-70 to Guthrie) (91094); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 15, 1996.