HomeMy Public PortalAbout09927 O R D I N A N C E NO. 9927
AN ORDINANCE, appropriating Two Hundred Ten Thousand Dollars
($210,000.00) from the Operation, Maintenance and Construction Improvement Fund of
Coldwater Creek for engineering services for the final design of Upper Coldwater Sanitary
Relief Section D (I-70 to Guthrie) (91094); and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-860 with Stock & Associates for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Two Hundred Ten Thousand Dollars ($210,000.00)
is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund
of Coldwater Creek for engineering services for the final design of Upper Coldwater Sanitary
Relief Section D (I-70 to Guthrie) (91094).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-860
with Stock & Associates for engineering services for the final design of Upper Coldwater
Sanitary Relief Section D (I-70 to Guthrie) (91094); said contract to be comprised of such
terms and conditions as are approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take
effect immediately upon its enactment.
The foregoing Ordinance was adopted August 15, 1996.