Loading...
HomeMy Public PortalAboutComprehensive Monitoring Table Summary of Relevant Requirements for Comprehensive Monitoring Plan SourceApplicable ProvisionsPotential Monitoring Options Requirement Comments Discharges shall not cause or Town of Truckee (TOT) & Placer MS4 permit Attachment 4 Receiving water sampling at May include compliance points in Basin 1 contribute to an exceedance of MS4 Permit, Lahontan Basin Receiving Water Limitations A.1., selected compliance points.Plan as well as other points depending water quality standards.Plan prohibitionBasin Plan Implementation on nature of drainage network and chapter.location of significant sources. For applicable new development, Town of Truckee (TOT) & Placer MS4 permit Minimum Control Demonstrate/track compliance May be most appropriately addressed 2 peak storm water discharge rates MS4 PermitMeasure (MCM) D.2.e. and with requirements using hydro-through provisions in the SWMP, shall not exceed pre-development Attachment 4 Design Standards modification modeling, low impact codes, and ordinances. Selected where there is the potential to B.2.a. & B.2.i.design (LID) specifications, approach may also have the potential to increase downstream erosion. various rapid assessment or address Martis Valley Community Plan Incorporation of volumetric or flow-other approaches.(MVCP) cumulative effects based treatment control design requirement. standards for new development. Identify significant source areas TOT & Placer MS4 permit, MS4 permit MCM D.2.f and Drainage and source areas Monitoring must be able to identify 3 and minimize storm water pollutants Truckee River (TR) TMDLAttachment 4 Design Standards mapping (including legacy sites), pollutants of concern and demonstrate of concern.B.2.c., 13267 letter, TR TMDL.discharge point sampling, effectiveness of control measures. receiving water sampling, Monitoring may overlap considerably bioassessment.with requirement #s 1 and 7. Selected monitoring may also have the potential to address (MVCP) cumulative effects requirement. Protect slopes and channels from TOT & Placer MS4 permit, TR MS4 permit MCM D.2.e. and Visual assessment of new Selected monitoring may also have the 4 erosion.TMDLAttachment 4 Design Standards development projects and legacy potential to address (MVCP) cumulative B.2.d., 13267 letter, TR TMDL.impacts.effects requirement. Provide proof of ongoing BMP TOT & Placer MS4 permitMS4 permit MCM D.2.e & f. and Visual inspections and reporting. 5 maintenance.Attachment 4 Design Standards B.2.h. Properly designed outdoor TOT & Placer MS4 permitMS4 permit MCM D.2.f. and Visual inspection, discharge 6 material/storage and pollution Attachment 4 Design Standards sampling. prevention/good housekeeping for B.2.f. & g. municipal operations. Description of layout and operation TOT & Placer MS4 permit13267 letter.Mapping of drainage areas, May have considerable overlap with 7 of storm water system.outfalls, and relevant source requirement #3. types based on land uses. Illicit discharge detectionTOT & Placer MS4 permitMS4 permit MCM D.2.c.Visual inspection. 8 Road sand trackingTOT & Placer MS4 permit, TR MS4 permit MCM D.2.f. and TR Record keeping. 9 TMDLTMDL. Squaw Creek Bioassessment & Squaw Creek TMDLTMDL Monitoring ProgramBioassessment per Herbst Need SAP from Lahontan Water Board 10 physical habitatprotocol