WHEREAS, the Pollution Abatement Program will require
construction by the Mississippi River Subdistrict of an
interceptor sewer across the right of way for Highway I-70 at a
point between Washington Avenue and Spruce Street, and
WHEREAS, the State Highway Commission of Missouri
proposes to construct said section of Highway I-70 in the near
future, and
WHEREAS, the cost of constructing such sewer after
completion of said highway would be unnecessarily high and it is
in the public interest to provide for simultaneous construction of
said sewer and highway under a single contract,
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT that the Executive
Director be and he hereby is authorized and directed to enter into
an agreement with the State Highway Commission of Missouri for
simultaneous construction of said sewer and highway on
substantially the terms of the Agreement annexed hereto as ANNEX
TO RESOLUTION NO. 641.
BE IT FURTHER RESOLVED that the obligation incurred by
such agreement be an encumbrance on existing appropriations from
the Subdistrict Planning Fund as reimbursable expenses of the
Mississippi River Subdistrict.
ROUTE I-70 ST. LOUIS CITY PROJECT I-70-5(64) ANNEX TO RESOLUTION NO. 641 AGREEMENT
This agreement entered into this ____ day of
________________, 1963, by and between THE METROPOLITAN ST. LOUIS
SEWER DISTRICT, a municipal corporation and a political
subdivision of the State of Missouri with its principal office at
2000 Hampton Avenue, St. Louis 10, Missouri, hereinafter called
Sewer District, and the STATE OF MISSOURI, acting by and through
the STATE HIGHWAY COMMISSION OF MISSOURI, hereinafter called
Commission,
WITNESSETH:
WHEREAS, Commission proposes to construct and improve a
section of State Highway designated as Project I-70-5(64), Route
I-70, St. Louis City, in the vicinity of Washington Avenue to
Spruce Street, in accordance with certain road plans on file in
the office of the City Registrar of St. Louis, Missouri, and
WHEREAS, as a part of the Pollution Abatement Program,
the Sewer District proposes to construct a foul water interceptor
trough and 24" interceptor sewer eastward from its existing sewer
Shaft No. 4-10C located approximately 65 feet east of Route I-70
centerline at Station 817-19 as generally shown on the plan
attached hereto and made a part hereof, and
WHEREAS, the simultaneous construction of the foul
water sewer would cause conflict with Commission's contractor, and
WHEREAS, the construction of the foul water interceptor
sewer by the Sewer District after completion of highway
construction would necessitate the installation of approximately
40 feet of 24" pipe under the completed pavement and sidewalk,
either by trenching or tunnelling,
NOW, THEREFORE, it is agreed as follows:
1. That it is more advantageous and economical to the
parties that the construction of the foul water interceptor in
Shaft No. 4-10C, together with 52 feet of 24" pipe and brick
manhole No. M-1 be constructed by Commission in its highway
construction contract.
2. That Commission shall include in its highway
construction contract the furnishing of all materials, labor and
equipment necessary to perform the proposed foul water sewer work
shown in red on the attached plan which by reference is
incorporated herein and made a part hereof.
3. That Sewer District shall reimburse Commission for
material, labor and equipment at the contract bid prices for the
actual costs incurred plus 10% for engineering and contingencies.
The total cost of the work to be performed by Commission is now
estimated to be $4,675.88. Upon the completion by Commission and
acceptance by Sewer District of all work covered by this agreement
and upon receipt from Commission of two (2) copies of an itemized
bill, Sewer District shall promptly make payment in full therefor.
IN WITNESS WHEREOF, Sewer District has caused this
agreement to be executed on the ________ day of _______________,
1963.
THE METROPOLITAN ST. LOUIS SEWER DISTRICT
By______________________________________ Executive Director ATTEST: __________________________ Secretary-Treasurer STATE HIGHWAY COMMISSION OF MISSOURI By_________________________________ Chairman ATTEST: ___________________________ Secretary APPROVED AS TO FORM: ___________________________ Assistant Chief Counsel
ROUTE I-70 ST. LOUIS CITY PROJECT I-70-5(64) C O S T E S T I M A T E INTERCEPTOR SEWER FOR METROPOLITAN ST. LOUIS SEWER DISTRICT Estimated construction cost of foul water interceptor trough in existing Shaft No. 4-10C, 24' foul water sewer and brick manhole No. M-1 to be constructed by Commission for the Metropolitan St. Louis Sewer District.
24" Pipe 52' @ $ 17.00 $
884.00
Br. Masy. 400 C.F. @ 3.25
1,300.00
M.H. Fr. & Cover 1 90.00
90.00
C1. 3 Exc. 375 C.Y. @ 5.00 1,875.00
C1. B Conc. .62 C.Y. @ 150.00
93.00
Reinf. Steel 44# @ .20
8.80
$
4,250.80
10%
425.08
$
4,675.88
The foregoing Resolution was adopted June 7, 1963.