Loading...
HomeMy Public PortalAboutR1096 R E S O L U T I O N NO. 1096 WHEREAS, the former Affton Sewer District constructed a public sanitary trunk and outfall sewer system which was designed and used to serve only that part of its tributary drainage area which lay within the former Affton Sewer District, and WHEREAS, the bypassing of the Affton Treatment Plant caused an overload of the outfall sewer, NOW, THEREFORE, BE IT RESOLVED: 1. That it is necessary in the interest of the public health to construct a relief sanitary sewer which will be entirely within the boundaries of the former Affton Sewer District to properly serve the drainage area tributary to the former Affton Treatment Plant at Tiber and Anchor Drives in St. Louis County, Missouri. 2. That such sewer shall consist of approximately 776 lineal feet of twenty-four inch vitrified clay pipe and appurtenances. 3. That the estimated probable cost of such improvement is Nineteen Thousand Five Hundred Dollars ($19,500.00). 4. That such improvement shall be paid for from moneys formerly of the Affton Sewer District. BE IT FURTHER RESOLVED that a public hearing be held within said improvement area to afford all persons interested in said improvement an opportunity to be heard; that such hearing shall be held at such time and place as the Executive Director shall determine, but not less than ten nor more than thirty days after the adoption of this resolution; and that notice of such hearing shall be given by the publication of notice in at least one issue of a newspaper of general circulation within The Metropolitan St. Louis Sewer District not less than ten days in advance of the date of such hearing. The foregoing Resolution was adopted December 22, 1969 -2-