Loading...
HomeMy Public PortalAboutR2362 R E S O L U T I O N NO. 2362 WHEREAS, the Standard Construction Specification Committee of the Metropolitan St. Louis Sewer District has recently revised and developed Standard Construction Specifications for all sewer and drainage facilities projects which are intended to be dedicated to the Metropolitan St. Louis Sewer District for public operation and maintenance, and WHEREAS, the Board of Trustees of the Metropolitan St. Louis Sewer District desires to adopt the aforesaid revised Standard Construction Specifications for all such projects, NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT, That the Standard Construction Specifications as developed by the District's Standard Construction Specification Committee, which from time to time may be revised by said Committee, are hereby adopted for all sewer and drainage facilities projects which are intended to be dedicated to the Metropolitan St. Louis Sewer District for public operation and maintenance. The foregoing Resolution was adopted March 24, 2000.