Loading...
HomeMy Public PortalAboutr2406R E S O L U T I O N NO. 2406 WHEREAS, the Executive Director of The Metropolitan St. Louis Sewer District has prepared a Short List of proposed consultants for the design of District projects identified in the Annual Budget Supplement 2001-2002 Capital Improvement and Replacement Program, as recommended by the District’s Consultants Short List Committee, and WHEREAS, Consultants on said Short List will be sent Requests for Proposals for specific projects as identified by the Short List Committee, and WHEREAS, said Short List may be modified from time to time by resolution of the Board of Trustees of the District, NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT that the Short List of Consultants, as attached hereto as Exhibit A, is hereby approved, provided that said Short List may be modified from time to time by resolution of the Board of Trustees. The foregoing Resolution was adopted April 12, 2001. FY2002 Projects 29-Mar-01 Project Name Construction Cost Estimate Short listed Consultants Selected Consultant Infrastructure Projects SAIC (2)Broadway and Steins Relief Sewers $650,000 Parsons Engineering Science (1)Old Mill Creek Sewer Rehabilitation Phase II $1,725,000 O'Brien & Gere HDR (1)Fenton Wastewater Treatment Plant Improvements $3,000,000 Madison Madison (MBE) (2)Replacement of various pump stations $1,800,000 URS Coldwater Treatment Plant Improvements(Final design) $40,000,000 Black & Veatch George Butler Assoc (1)Gravois Trunk(Whitecliff to RDP) $2,700,000 Crawford, Murphy & Tilley (2)Lindenwood Sewer System Relief $800,000 EDM (1)Greystone Manor Relief $343,000 Atteberry (2)CSO Michigan St $400,000 Atkins Benham Woolpert (1)RDP Channel Rehabilitation Phase II $4,000,000 TSI(MBE) (2)Sewer Improvements in St. Louis City Parks $1,500,000 Parsons Brinkerhoff Quade Stock & Associates Harlem Baden project(Kossmuth and Marcus) $500,000 TDP(MBE) Harlem Baden project(Broadway) $1,400,000 ABNA(MBE) Harlem Baden project(Davis Park) $600,000 OEI(MBE) Harlem Baden project(Highland) $1,500,000 AFRAM(MBE) Harlem Baden Project Mentoring Earth Tech Page 1 FY2002 Projects Project Name Construction Cost Estimate Short listed Consultants Selected Consultant Stormwater Projects Kortwright-Warson Place Storm Sewer Phase II $350,000 Reitz & Jens (2)Gray Dr. and Oak Dr. Storm Channel $550,000 EDSI(MBE) (1)Coldwater Creek Bank Stabilization - Wright to Geraldine $675,000 Hanson Zambrana (MBE) (2)Corona Park Storm Sewer Phase 4A & 4B $700,000 Volz (1)Trenton Creek Storm Sewer Phase V $825,000 Farnsworth Group Clayton (1)Greenview to Berry Storm Sewer $765,000 Harding ESE (2)January - Thurston Storm Extension $680,000 Zurheide-Hermann, Inc. Heideman (2)Mayfair Dr. and Bella Clare Dr. Storm Sewer $240,000 Basilico(MBE) (1)Page and Walton Storm Relief $301,000 Doering Cole (2)Spoede Acres & Oak Park Storm Sewer $285,000 City Design(MBE) (1)Brown to Argyle Storm Channel $368,000 CDG Fleming(MBE) Urban Stream Stability Expert Systems University of MO – Rolla University of Iowa Iowa State University University of MO – Columbia Washington University Southern Illinois University –Edw Colorado State University Page 2