HomeMy Public PortalAbout2016-10-27 Subcommittee Meeting - 2017 Roads Public Works Subcommittee Presentation
October 27, 2016
' Road Program Goals
' 2016 Road Reconstruction Update
' Pavement Management Update
' 2017 Road Reconstruction List
' Capital Projects and Planning
' Planning, Design & Construction
' Summary
Key Road Features
IV 73 +/- miles of road
IV 144 miles of sidewalk
' 3,200 catch basins
' 1,000 fire hydrants
55 miles of residential roads
' Average width of residential roads is 25 feet
Town -Wide Pavement Condition Index: 65 (2012 — 59)
Total Work Backlog: $88 million (2012 - $92 million)
•
6.8 miles of roadway repaved since 2012
Town -
1 Development Mitigation
Work Planned and Completed
2015 Road project carryovers substantially complete
• Fifield Street
' Lowell Avenue
• Raised tables on Church Street
' Raised tables on Evans Street
' 2016 Road projects substantially complete
' Hillside Road
• Hillcrest Circle
' Purvis Street
• Merrill Road
' Grenville Road
' 2016 Road projects scheduled for Spring 2017
' Edenfield Avenue (Green Street Grant) -
1 J
@ p
V I
I it kz'
=Y }
Hillcrest Circle—After`
t1
�' _ -`- _- � �'•i -f},� 'S Y � ply _
- -„
Hillside Road—Before -Hi I It]de Road—After
OY
Q � _�__ _
Purvis tr.et-Before - Purvis Street—After
it
Merrill Road—Before Merrill Road—Under construction
3...r••_,C.
f
<9
;-me,M-
.. 14
741
Grenville Road—Before Grenville Road—Under construction
JOE,
:..E3 rq r rJt P K r
'7� d
Fayette Street—B m Fayette Street—After
Complete Streets Elements
T
r
u
.. _ . iu rmrcomw
Nichols Ave. Fifield Street
Palfrey Street/Church Street Lowell Ave./York Ave.
Capital Planning Tool
aintenance and Repair
Mill and overlay repairs
Full depth patch
Crack sealing
Sidewalk reconstruction
Road Reconstruction
' Road reclamation
' Mill and overlay
Maintenance, Repair & Reconstruction
' Provide a variety of maintenance treatments to
prolong the useful life of less deteriorated
roadways
' Coordinate road reconstruction activities with
capital planning and utility work
' Seek long term planning and alternative funding for
large-scale projects
' Improve accessibility and safety for all users by
using "Complete Streets" principles
Typical Techniques
Management
Provide a variety of maintenance treatments to
prolong the useful life of less deteriorated
roadways
GExcellent , F Deferred Maintenance
Deferred
Maintenance
*� Good � F Crack Seal
$ Crack
� F Microseal
Seal
$$ F Mill & Overlay
• ' •$$$ Mill F Reclamation
& � Very near
Overlay
$$$$ a
Reclamation
e • D 5 14 15 24 25
Time �Years�
Eh1GIhFEERiM�r P111111� �1'kS
ut�.e�ree�r rnRsmwn.-
Typical ManagementTechniques
Deferred Maintenance
$ Crack Seal
$$ w
M i c ro s e a
$$$ Mill & Overlay
$$$$ Reclamation
Union Street
r , r
Typical ManagementTechniques
- Deferred Maintenance �1
Y
Crack Seal - - - - -
$$
M i i
crosea l
f
r r
$$$ Mill & Overlay
a :a
$$$$ Reclamation
i
Dexter Ave.
E
r , r
Typical ManagementTechniques
- Deferred Maintenance
$ Crack Seal
$$ M icrosea I ,
r .
$$$ Mill & Overlay
$$$$ Reclamation
V- M,
hw
' r , r
Typical ManagementTechniques
Orpn
- Deferred Maintenance
$ Crack Seal
$$ M icrosea
Mill & OvPrla
$$$$ Reclamation -
Spruce Street
r , r
Typical ManagementTechniques
- Deferred Maintenance
e
$
Crack Seal
$$ Microseal
$$$ Mill & Overlay
$$$$ Kecla mation
r
Evans Street/Buick Street ► r
Plan Development
Windshield survey of all streets
is Identify curb type & reveal, general sidewalk
conditions, number of castings
' Develop a "Pavement Condition Index" ( PCI ) for
all streets
' Industry standard practice developed by Army
Corps of Engineers, adopted by APWA
Numerical measure (0-100) of roadway condition
based on observed surface distresses (cracking,
patching, potholes, utility cuts, etc. )
Inspection Form
Street Data Acceptance: Accepted J Segment Length(FT} 319
ObjectlDr 423 Functional Class: Local J Width AFT); 75
Street: DERBY ROAD Manholes: 2 - Hydrants; �� Right of Way(FT): I qD
Segment Name: IDERRY Catch l;asins: � Pullbvzes: ��
From Street: lACK50N ROAD � Water Gates: � Driveways; ��
To Street; WATERTOWNSTREET J Gas Gates: lV �OtherlJtilities:
Inspection 6ata� Curb 6ata
Curti(Odd Side) (None
Inspector: REi �' � Avg.Reveal(IN): ��
Pavement MateriaV: IgC J
i
inspection bate: 9�30�201fi Curti(Even Side) (None
Avg.Reveal(IN): ��
D'tstreas Data
Sidewalk 6ata
Field Inspections
Dccurerroe Extern{
Random Cracks: (ModerateElm Sidewalk(Odd Side) (Concrete J
Transverse�Lvngitudinal Cracks: (Moderate J 20J Avg.Width iFT); r�
AlligatarCracking; (Moderate J SOJ Condition (Good
Potholes: (Moderate J 1AJ
Sidewalk(Even Side) Co-ncrete J
Raveling: None J J
Avg.Width(FT). ��
Rutting,CarrugatiansarPushing; +Moderate J 25J
Condition +Good J
Cross Trenches,lJtility Cuts,Other Patches: H'� J SOJ
Main Line Trenches: None J J Striping 6ata
General Notes: I CenterlineNone
Edgeline iOdd Side) J
Acceptance Nates; I i Edgeline(Even Side)
Sharrvws �
Field Inspections
............
b
E
- _ � --
; 1
Field Inspections
J=-y No surface distresses
Union Street — PCI 100
Field Inspections
Low to moderate cracking
over 30% of surface
x M oderate cross trenches
utility patches
Walnut Street — PCI 73
Field Inspections
— J - Moderate cracking over
€ e i 50% of surface
Moderate cross trenches
L
& utility patches
Low rutting/depressions
Hosmer Street — PCI 52
Field Inspections
Severe cracking over 75%
q of surface
1 47,
Severe cross trenches,
mainline trenches, utility
....... ....... . ...............
. . ................... patches
Moderate rutting/
depressions over 50% of
surface
Severe potholes
Capital Planning Tool
bills
MOR
pall
Next Steps
' Integrate/coordinate available utility data &
capital plans
is Gas, Water, Sewer, Electric
' Identify preventive maintenance
is Crack Seal
41 Mill & Overlay repair sections
Sidewalk Repair
Program Activities
` Maintenance and Repair
Mill and overlay repairs
Is Full depth patch
Crack sealing
Sidewalk reconstruction
� Road Reconstruction
Road reclamation 2017 Road Program
Mill and overlay
Developing a "Universe of Projects"
' 2012 & 2016 Pavement Management Inventory
' Windshield surveys
' Maintenance records
' Capital projects ( proposed and completed )
' Resident input
Developing the List
Prepare detailed cost estimates of high priority
streets
' Develop a program that fits within funding
constraints
' Prioritize streets in greatest state of disrepair
' Continue ongoing preventative maintenance
' Consider alternative funding sources
' Consider geographic equity
Utility Coordination & Capital Planning
Hovey Street water main replacement
Springfield, Forest, Malden, Everett water main
replacements
Chandler, Burnham', Bridgham water main
replacements
' Webster water main replacement
' National Grid will complete about 3 .4 miles of
gas main replacement in CY 2016
Proposed Streets
' Hovey Street
' Cushman Street
Waltham Street ( Rosedale Road to Bridge Street)
' Knowles Road, including Holly Street and
Whitcomb Avenue
' Irma Avenue
Hovey • Sewer and drain replaced in 2013
'\ Street Gas main replaced in 2014
G.
• Water main replaced in 2016
_ • No curb
• Sidewalks in poor condition
` N • Multiple trenches
• Heavy cross trenching
• Alligator cracking
00 feet long - 24 feet wide
is
Watertown
MCIF TP
ut�.e�r�ee�r rnRsmwn.-
Cushman Street
A! z
t4 1 4-,I
bj
L
Cushman0 Gas main replaced in 2015
Street0 No curb, no sidewalks
0 Alligator cracking
0 Raveling, Rutting
0 Potholes
350 feet long — 21 feet wide , ' r
Waltham Street
f
Nk
Waltham • Gas main replaced in 2015
Street • Granite curbing
• Mainly asphalt sidewalks in poor condition -
• Alligator cracking
• Cross trenches
• Rutting
• Collector road
Watertown
1.350 feet long — 28 feet wide
Publisarks
ut .eree�r rnRsmwn.-
Knowles Road, Holly Street & Whitcomb Street
.r
,r
o- I
Knowles Road, - • - • •
Holly Street & - • . ' • . •
Whitcomb •
Street •
1,225 feet long (total) — 23 feet wide r
_ 11
x
• Water main replaced in 2014
• Gas main replaced in 2015
• Some curbing, mostly paved borders
• Mostly concrete sidewalks, poor condition
• Multiple trenches
Watertown x�m a
• Alligator cracking Pllllllso►'ks
ut .eree�r rnRsmwn.-
Irma Avenue Construction Concerns
" - U U
,t
10
: .
n -yA/ '- ifs ,� w.et .✓:-
- -
• � r
j,
a
Walls, trees, and parking
Typical Elements of 2017 Road Reconstruction
• . • reclamation and • . •
• repairs - 77
•
CurbingqP
,a• ,�• \
ConcreteOk
sidewalks
T rr,
Handicap 1 •
Grass borders and street trees
TOWN LAYDLIT _
E1pSi ROADWAY
PROP. PROP.
9DEWAL1c PROP.ROADWAY SIDEWALK
5'-C" (MIN.) (MIN} VARIES MATCH E%IST. (��) 5'-O" (LIIN.JI
1"LOAM&SEE , .4"LOAM h SEED
E>Q5i CROUN�� J _ MAX 2.0% TfP.) 2-D%(TYP� _ +A% 1.5�%^i`IP -- rEfGST.GROUND
4"CEM. C9NC.
WALK SURFACE
FULL❑EPTH PAVEMENT RECLAMATION
8" GRAYEL HDRRDW, TYPE B d"CEM.CONC
WHERE REQUIRED/DIRECTED EIY GRAN.CURB-TYPE VA-4 WALK SURFACE
DPW SUPERINTENDENT (TVPJ 4"LOAM do SEED
-4"LOAM k SEED A�+tely�DrWA►1 Droxfistd
TYPICAL SECTION CRAN, CI1RB-TYPE VA-4 1��D7�`_ arks
FULL DEPTH PAVEMENT RECLAMATION ■■■ 7 Y
NaT ro scALE ���+ee�r rnRs mwn.^
•CON STR 11CT10N TT7LERANCE t0.5%
Common Street
0 Public Works Sub-committee meeting on April 20, 2016
Development of bid documents for construction
� tf
7
�a�Z
CON
N37RFFT ' I -
E
' r r
Mt. Auburn Street
` Project ranked 3rd among 55 projects in the MPO
DPW spoke in support of project at MPO
Phased gas main replacement has begun
Update meeting to be scheduled late fall
Provide Preliminary Design to MassDOT in spring
Planning, Design & Construction
' MassDOT Arsenal Street ' Arsenal Street mitigation
corridor study projects
Hanover project
Fresh Pond Parkway corridor
Greystar project
study 480 Arsenal Street
' Watertown Greenway Athena Health
extension Arsenal Mall
' Hosmer Safe Routes to School
Coolidge Square neighborhood
Implementation 480 Arsenal Street
65 Grove Street
' Watertown Square
' Pleasant Street corridor
' Community Path study 330 Pleasant Street
Challenges
Limited number of vendors bidding on work
• Reflected in bid prices
• Affects schedule
Weather
• Severe weather conditions can lead to higher than expected
levels of deterioration on streets
• Future street conditions are always subject to uncertainty
and change
IV Planned and unplanned utility work
Reduces road PCI and increases maintenance or reconstruction
needs
` Private development
Usually addressed through mitigation projects
Enhance areas adjacent to new development
` Impact of enhanced scope of projects on budget
` Providing adequate staff supervision of contractors
2017 Road Reconstruction List
' Hovey Street
' Cushman Street
Waltham Street ( Rosedale Road to Bridge Street)
' Knowles Road, including Holly Street and
Whitcomb Avenue
' Irma Avenue
WR T F4 Watertown T
Publisarks
ut�.e�r�ee�r rnRsmwn.-