HomeMy Public PortalAbout09-0376 Branigin O
;jE: a+r
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 08-19-2009 PERMIT#: 090376
WORK DESCRIPTION INSTALL SOLAR WATER&POOL HTR
WORK LOCATION 1406 SEVENTH AVE
OWNER NAME JOHN&JUDY BRANIGIN
ADDRESS PO BOX 82878
CITY,ST,ZIP CONYERS GA 30013-9443
PHONE NUMBER
CONTRACTOR NAME MASADA PLUMBING
ADDRESS 1014 CARROLL ST
CITY STATE ZIP SAVANNAH GA 31415
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 25.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $25,000.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
i
Signature of Building Inspector or Authorized Agen i''t oriefA it
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
. .
n (-----,\
• ,ol, fr,
City of Tybee Island • Community Development Dept. Viriw y.
Inspection Report
•'''''••• "";
:..
."...' . ... .'
11 ., 403 Butler Ave. • P.O. Rox 2749 - Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 ....triarti
,.:1,.1....J;:i.•
.-........
:ilErdn
Permit No, -- Date Requested 4/12,104
Owner's Name i16 1i Date Needed 4,/zzioq
_
Gen. Contractor Subcontractor 1.1113i14-4444
Contact Information F- Jar ) ne---,175 Z!b cis;74
Project Address L- 1 .-1 ‘ Trk_ S_I) 't 1,4-07F_.
Scope of Work ' \ - Pff-e., 4 ?D_L __4421
-,n
Inspector '1144 Date of Inspection
Inspection -PL)111S( 1-:-.1 N,_)3/(.-- Pass Ea/Fail ft Fee
1 Inspection Pass 12 Fail 0 Fee
Inspection Pass 0 Fail 0 Fee
Inspection Pass 0 Fail 0 Fee
C4-05%
.� CITY OF TYBEE ISLAND,
BUILDING &ZONING DEPARTMENT
P.O. Box 2749
Tybee Island, GA 31328
- ,a Phone(912) 786-4573 • Fax (912) 786-9539
PLUMBING PERMIT APPLICATION
Date S
Location of work (street address) (672)
Contractor 5 C 4 e - l C,,,, ,�-i h
Address of Contractor /Q / „o
Telephone number of Contractor ,� — 1f//1�-— 7 r 7
Name of Property Owner fj ��} ��4
Mailing address of Property Owner /
Telephone number of Property Owner
Date work will be ready for inspection, if known (L.,,_l(
Permit Number
Estimated cost of construction 15 co 0
New Work Replacement Oil Gas Electric
Backflow Preventor
Disposal Unit
Domestic Water Connection to Main
Drain Roof or Area
Drainage or Vent Piping
Fire Protection Sprinkler System; Number of Heads/Nozzles
Grease/Oil Trap
Hose Bib
Hot Water Heater
Icemaker
Lawn Sprinkler System
Plumbing Fixture
Residential House Sewer Connection to Main
Sewer Cleanout
Sewer Stub
Vacuum Breaker
Water Meter
Water Service Line—New Residence
Water Service Line—Replacement
Water Softener
Other //
AUG-17-2009 09:55 FROM:SOLARTEK 9122013542 TO:7869539 P.1
TO: City of Tybee Island Department of Inspections Attention Ray
FROM: Jimmy Tarpley Masada Plumbing
Ray,
Here are the schematics and cut sheets for the 8ranigin project at 1406 7''Avenue. Please call with any
questions at 912-412-1657.
Jimmy
P;-e)
AUG-17-2009 09:55 FROM:SOLARTEK 9122013542 TO:7869539 P.2
Collector
Sensor
Solar
+
I r
Collectors rI r y yr
r
Ir
ry
�,
II
�r
r
yr
Iy
II
II
rI
r
yr.+
f� Drainback
PR-45, Pressure I
/___ Reservoir
Relief Valve 'C' rr
-
/aQ C
-1/Q
Thermometers)
0 1—
P�np /.__ Infixing Valve 'E'
_-� i-- F M y� • - • Hot Water Outlet
J,
I I
�A
Differential
�--- ►. Cold Water Inlet
Control ---__--- \s— Isolation Valve 'I)'
P&T Relief Valve 'B'
Electric Element (backup)
Access Panel
1 p
- Wrap-Around
Heat Exchanger
eTank Sensor
Fill/Drain — - Ckl _p
Valve 'A' •. - . System Drain
Solar Storage Tank
- - - - — — _ ,
LL =E NE muTN¢ COLLECTORS SHALL
BRACKET xslwlw,8017 ADF BE INSTALLED N-COMER Sx3,11"1H(3'L BOBET6 111
R
7 IDES"AS SHOW ON OLA6RAM ALLY SORT,MIN F10J(p i3
7!K 23L ALLY TUBE ^+
EOCENE NOUN NG VRACJO:F INSERT 7N ANALi�D �ppppp
Y/Lm BOLT AS
Illii IiIOMF K1A11
SOLE1 E BRAND FLUSH In IN
ro
b ;
LO 1111111111 2
e MOUNT STAND} OFT= ASSY
LT I r ' SCALE NTS
iD oOROnpN
N _
O SCL1NE BRIM ROOF ZONE 3 Mr LONG ONENOCN I
COLLECTOR COMERS GAtEL T]D ROOF SELENE
BOWIES S LENS BIAM 1 1 _
Myrna BRACKET COLLE0ICR
I
oomooN HP x ROOF COMER ZCNE SHALL BE 10 PERCENT
OF 9104?1111O1901 OF M UNK OR 40
PLAN OF COLLECTORS PEMCEJIF OF MEAN ROOF NOCHE CR 7 FT I 1
ig !
-Mal DER IS SUAL ER.
SCALE: 3/16...1.-0- ROOF LAYOUT PLAN 94.1'11..
SCALE: NONE
1.COLIFCIOROCOOMECTIONS SNON4 NAVE BEEN OES GWED 70 RESIST we LOADS WADED 01'TM 2D04 MUMS CDO.WOE 2001 `
S
II
UPPL EMDOS,CHAPTER IR FOR 140 MPH C 'C'MI'INICO Y AND PER ASOE 7-02 CHAPTER ILO FOR 140 MPH E7TCSNRE 111
(U V'Mb 14LOOFFi T 10ALLY. ,
T F b PT at L N451NINJT CONIIMJOOS ALONG '0
M 1.LAG BOLT c PAd7E3 Ate ARE BASED VON'NAnKON&DORM SPEOFICA11W KR STRESS CRAM RUDER AND Fuel RIR WUAMO f
FAST/MOS.As PLIBUSHED BY 711E WOOL FOREST PRODUCTS ASSOCATIOLL ll/3/R•ST , "AL- ROO TN/NF
Cll &TEASER EA ENT -PROW(• .-Ce oi' 1000 TRUSS N
m 3.ALL CaOAEOBOLH1 ARE FOR ROOFS H7 7O 40'YA1L SLOPE OLtiRT1G . AT ALL W71 CENTER 8405•JSPAONc ?L97EST SIP
CU
4.ALL CONVEO• tS ARE FOR MEAN ROOF NEWS HOT 14 EMCEED JOT-C'. MAX p9' C A�
S APPLY ROOF MICE SEMAN{S 10 AU.=DACE 9NTFACF3 MISSED TRUSS SOLEIV E a `
B.14.71301AR1ELY SOLEE,MOL/RNO BRACKET CAN BE Fumes in 7HC soma COLLECTOR MIN BOER(F)IC sm.BELT AND r r 1 BRAND SPANNER INSTALL lielli
1RlT.CR(21 X'ref TAPP=SHEET HEFAL SCREW Q SCALE: Its
SOME WIDE SOLDJE !RACKET Amain STPJ& scam MO1Nm0 I•
LDUNIBIC MOUANIO OFF ASSY HOOD MUSS BRACKET AND STAND
HOOF
BUCKET =ERE BRAND sHEAIz BRACKET =CRETE
SOME MAO SFS11ST raj SOEAE BRAND N
3HEA1NBN0 CCLLECFOq nil
OOLNECIOR OR BEilf71 COLLECTOR
00TER BARREL
SC
LLI /S /jff TREE n6�R7¢afl
Ai f `�`� 3 ,.. �1F for
sHFansra
CO ROOF -.1140.1104
E SEE +F_3 n
0 43T LOCATE SET O= V qA STAUl.CC 1RU99]AND NM. tC DIA >•- ti'OIA SEABEES S .LAO SOUS AT EACH 'WFL tilt CUF oR RFNO9E �. 1107E OJT OJT CR BENOSE 1JHiNH 4 160 S E LAG SOLD AT EACH SR RAG BOAS AT EAW A�0 TRU s SOLF7,E owe owt T1T. THE 10 fb7ALL STANXIF 1RE 10 INSTAL!.STANDOFF NAAS AT EACH ENIO Mee BRAID W M TYP. SOME BRAND CONN LIP. E52raA AI Y.T EN MTNOAu` DIE IRANG C� ASSY.�}�I RENSTALL IIF!Pitrialo
1..0 CR IUW�EDLO
MISSED TRUSS SOLEN SHINGLE/METAL HARDWARE "" mamma
O 1 3 BRAND Iy.AILfR INST. s BARREL TILE ROOF
win__
m l BUILT UP ROOF t FLAT TILE �OQF
CD SCAlE 1-1/2-1tp- SCALE 1-1/2••1•_0• SCALE 1-1/2•-1'-0' SCALE 1—lir... —0
ID
N
c19
D
CC
AUG-17-2009 09:56 FROM:SOLARTEK 9122013542 TO:7869539 P.4
Pool System Components,Installation and Operation
Controller „
►1.4 ►j�
$M1fCf
.::` •W L• :i I - existing_
r Controlled Heater
Valve
04 F4
Figure$Automatic control plumbing schematic
Accurate differential temperature control is difficult to achieve because of the small
temperature rise that takes place in solar pool heaters.A sensor,tapped into the piping at
a convenient place ahead of the collector return line,measures the pool water tempera-
ture.Another sensor is housed in a plastic block and placed near the solar collectors,so
its temperature parallels that of the collector(or it may be attached to the collector outlet).
When the pool water temperature exceeds the collector temperature,the control valve
remains in the open position and the flow bypasses the collector loop. When the collector
temperature exceeds the pool water temperature,the valve is closed,forcing the flow
through the collectors.In practice it has proven equally effective to control the flow
through the collectors with a single solar sensor,which turns on the solar pump and/or
activates the diverting valve above a fixed solar intensity level.
When operating properly,a differential controller automatically adjusts to changing
conditions,monitoring variations in collector temperature caused by clouds,other
weather factors and the approach of evening. When collector temperature drops,the
control de-energizes the valve and flow bypasses the collector.Maximum pool
temperature limits can be programmed into some controls.
Control valves may be actuated hydraulically or electrically,One of the earliest valves
used was a hydraulically operated pinch valve consisting of a cylinder with an
expandable bladder inside.A high-pressure line connected to the discharge side of the
pump is used to expand the bladder,pinching off the flow and diverting it through the
solar system.A low-pressure line connected to the suction side of the pump deflates the
bladder and allows the flow to pass unimpeded.An automatic controller accomplishes
switching between the high-and low-pressure lines.
Electrically operated valves are also used.A differential controller may be used to
operate a solenoid that, in turn,activates the main valve in much the same way the pinch
valve is activated.Be sure the valve you select is specifically designed and constructed
for use on pool systems.Automatic control schematics,taken from the installation
diagrams of two low-temperature collector manufacturers are shown in Figures 9 and 10.
5-11
AUG-17-2009 09:56 FROM:SOLARTEK 9122013542 TO:7869539 P.5
Pool system Components,Instillation and operation
The most common method to divert the flow of water to the solar collectors from the pool
is to use a 3-way valve on the solar supply line. Similar to the in-line ball valve or
isolation valve,the three-way diverter valve is commonly used in the swimming pool and
spa industries.
Some of the 3-way manual valves are made to be used for solar pool heating. The 3-way
valve has a motorized diverter that attaches to the top of the valve to convert the manual
valve into an automatic or motorized valve. Other 3-way diverter valves are
manufactured with the motor assembly on the valve. in this case,a differential controller
sends low voltage power to the diverter actuator(or motor)and rotates the valve sending
the water from the filter to the solar collectors.A check valve after the 3-way valve
allows the solar collectors to drain into the pool when the pump is not operating. This
may provide freeze protection if the system tilt and piping was installed to allow
continuous drainage.
=or
ArrAtlir.
1,Auto
Nolo warm toodketuto coonootbM which help to l --
k
oocti eeYseme through ll 6-
Pinch Motor
.� I Valve (*Aetna)
Heated cool wator
to hooter
-„-
Hewater w y ---
t0 pool 4,,,_,
Figure 9 Plumbing schematic
5-12
AUG-17-2009 09:56 FROM:SOLARTEK 9122013542 TO:7869539 P.6
Pool System Components,installation and Operation
their performance). In Figure 21a,the length of the water path is the same for all
collectors,so the flow is evenly distributed.This style of piping will require extra pipe,
but improved collector performance compensates for the additional cost.
---iip —r. . , —I.. I
t-
:::,: :,i;'!:1' :.;; •:. i: :,..' '1, '1,''j
1'.,,
r.' !1:$)
• ,t S 0
V 14 - , —N. End cap
n A.Balanced now
Feed
.a. - .........- End cap
1 ,,,;,:".44 ,i,!' ]
.::.'.: 0 qi
i 1:3,
.:, :;,!, ,, :::,
O :ii,,':.:?;:;;:!!;:
'''' IR -"'"
r 13 Unbalanced flow End Cap
• Feed
Figure 21 Flow balancing in collector groups
Groups of collectors at different heights should be plumbed in such a way they all receive
water from the lowest point in the system and return it from the highest point.Figure 22
illustrates a properly plumbed system.The dashed line indicates a tempting,but
unsatisfactory,arrangement.If the return lines do not come from a common height,flow
through the panels will be uneven,causing a reduction in performance.Even with this
piping layout,a balancing valve may be required to reduce the flow rate in the lower
collector(s).
High
Point
40
7 )1
peed Return
Figure 22 Plumbing collectors at different heights
5-28
I`
a- CA1CR WASP ANCHOR W/(1)LAG BOLT
-- AS SHOWN BELOW SPACED VAX Y-0 o/c WOl W FMCS SHALL HMODOL
REYTERED O4ER ROOF TRUSSER IARLFSS NOTED MGT BE INSTALLED 14`O(A PANT
L- - TONES'AS MOM EN DIAGRAM
111111 . li: I CO I j $ P GABEL Uq ROOF crane,u �j frl ` r . RIE ROOF CANER Zeta SHUT RRE 13 PERCENT [� mm`1 ' CIF SHORT CORDISON OF BUIDMG,OR 40 i O Ln I 3 f L ° PERCENT EVER IEAHS iE91 •OR T FT � va cn Q,r i UJ 1 i ; ROOF ENO
/ I
` Ill it - CONq ai ��
O - 11ot)11 I ;II 1 HEilOCOL.PAi 1. ►fuOCaL'GATOR CLAMP'
I !. I . .!. J ROOF 3 :2vG ChIE4SON RISER STSTE11
4. 4. +. ROOF
CATI T DAMP CaifE4TNYR Tjf
�� HP ,:
CONDEMN
LAG BOLT AS 5110*4 BELOW PANELS(TYP) Nallif.4444 1/4.1:4A
PLAN OF PANELS ROOF LAYOUT PLAN .TA LOCATE BETS, ST SIT.
`2-f' SCALE: 3/ib°=1'-Q' SCALE: NONE TRUSSES ■NAL LAG BOLT
rsvo4L NOTFIC WiH AT MACH , . r�
Cu ��'' i I
cT 1.11E'SE PLANS ARE N COMPLIANCE VITH THE 2004 FLCEO A B'iILD240 COOL WTIi 2006 SUPPLEHEH'T3,SEC ON 8301.7-1.1 FOR MD EKPOSURE CATEGORY e.'NSE
11) PLANS REA0t4 N FTFECF LMTIL FUTURE CODE RENSWNS DICTATE THAT AN UPDATE IS NECESSARY.
2 PANEL.CONNECTIONS SWOON HAYS BEEN PERCHED TO RESIST ETNO LOADS CULT 4ED 04 NE 200E B RUDB®G CODE.CHAPTER T6 FOR 148 IPH ONPC61.FRE'C°LINO Imo//MSS NOTE:LAG BOLT LAY BE
0 VELOCITY AND PER ASCE 7-C2.CHAPTER 6.O FOR 148 MPH ETPCS-IRE'C•1688'VELOCITY TIPICAILY. - SETTER HA10ED IN ANY CIF 0E(3)OR 0.1 HOLES IN THE BASE OF 1-E II 1
CU 3.LAG BOLT CAPAOTIES Ake EI DIAENTS ARE BASED UPON'KA10NAL cam SPEW/CATICY1 FOR STRESS GP.ADE LUMBER AND FASTENINGS'AS PU8U ED BY THE GATOR CLAMP. I
Cn RATIONAL FOREST PRODUCTS ASSOC1'LTION. MISSED TRUSS
4.ROO TUNNEL TEST DATA FOR THESE CONNEGB0H5 HAS BEEN COMPILED BY TEXAS ARM LINVERSTL couar STATION.DL MO IS AYAZABLE OROUCH NE xox.ING •NAILER INSTALLATION i It I!i
3.N FOR SIMPLICITY,R ROOFS 0 TD 43•MAX SLOPE tOPDIT1O4 Alta ALL COIPECTORS ARE FOR WEAR ROOF HOa{1S NOT TO EICCEED 3O'-0'ACTUAL ROOF SCALE 1-1/2°n1'-0'
HEU0 .-GATtR CLAMP' HEUOCCL'GATOR CLAMP"
_ HELIOOOL"GATOR CLAMP' id
HEL/000L ROOF ROOF P SWATHING r cow PANL x/ E$U00�ARMOR_MAW ST�x - 1 YAIC 1'D/C i
RISER SYSTEM HEJOCCL . .024 0 1 11 EPS CORE I�CFPfI
StEIt ''..
PANEL
/ PANEL
I(, N 1i`N RISER SYSTEM HEL1001. PA
111 \ �_ /� � �1� +!,, FUSER SYSTEM ��,e� * PWSER51S'EOI _
diiiir
\� OR BETTER �. _ 11.1�yyf,,��1'a, STL EMT - �.. EGA1T i Rte
J A -
SEE NOTE 5 1 `
O "•f 1/4'W4 1/4'DA ST SU.BOLT , f.� S-S CLAi& `� sUI[ MD
Cu ST SIL 04/TOW ST 514. ...AAA - _
25 OR * SHIMS ALONG 1AG BOLT FENDER WASHER `1 SEE NOT S
PANEL FOR mom:, 3/8' STSA. 'AND ST SIt 1.�C NUT
O Ail.-THRD RC lP/NUT t WASHER EA TAG BOLT IB BE 1g1E BOLT MAY BE PLACED NOME BAT MAY BE
EY
Ll pp PLACED N ANY OF THE(}) SYS'Fwi STP. N ANY OF'HE(3)HOLES IN PLACED 8i ANY OF 7kE(3) ROOD MSS
Pty'[OCTET!`AT ai TARS *WES W THE BASE W SY THE BASE CF TrE GATOR BOLO RI THE BASE OF Sn� SIP
CENTER RODS R 3-D'ofc THE GA.TYIR CLAMP. QAyp. TIE GATOR CLAMP. OR
Cu MAX SPADING
MISSED TRUSS eSHINGLE/METAL/ COMP. PANEL ROOF i S-5 CLAMP STANDG. 1
cri CD . SPANNER INSTALL BUILT UP ROOF '''f2`a1�Q` SEAM METAL ROOF
0, SCALE: I-1/f f-a SCALE: 1-1J210• SCALE i-t/2'=7'-It
El
CU
r
0
D
CL