HomeMy Public PortalAbout09-0389 Tolle FF !'� .
/s_y,
d
14 1
CITY OF TYBEE ISLAND
PP
BUILDING PERMIT
DATE ISSUED: 08-31-2009 PERMIT#: 090389
WORK DESCRIPTION ADD NEW ROOF TO EXIST.CARPORT
WORK LOCATION 7 GULICK
OWNER NAME TWIG& SANDRA TOLLE
ADDRESS 2129 W MINNEHAHA ST
CITY,ST,ZIP TAMPA FL 33604-5736
PHONE NUMBER
CONTRACTOR NAME TWIG&SANDRA TOLLE
ADDRESS 2129 W MINNEHAHA ST
CITY STATE ZIP TAMPA FL 33604-5736
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $750.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
,/"y
Signature of Building Inspector or Authorized Agent: '
` b i-az cad 4 O 7+.1103-03i
l " l
(3c' 9
P.0.Box 2749-403 Butler Avenue,Tybee Island,Ge rgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
^' +//
,f . 1 i''''7'1
Homeowner Affidavit
STATE OF GEORGIA }
}
COUNTY OF CHATHAM }
On this 7 j day of , 20 G c' , I, /.'11 -r 5c s ';r4. ) agree
with this affidavit relating to the construction off (project description) ,Q1 4G G'�� �/7oI-
located at (street address) /— ��/(G/_ , Tybee Island, Georgia.
In accordance with O.C.G.A. § 43-41-17(h), any person is allowed to construct a building or structure on real property
owned by such person which is intended upon completion for use or occupancy solely by that person and his or her
family, firm, or corporation and its employees, and not for use by the general public and not offered for sale or lease. In
so doing, such person may act as his or her own contractor personally providing direct supervision and management of all
work not performed by licensed contractors.
However, if, under this subsection, the person or his or her family, firm, or corporation has previously sold or transferred
a building or structure which had been constructed by such person acting without a licensed residential or general
contractor within the prior 24 month period, starting from the date on which a certificate of occupancy was issued for
such building or structure, then such person may not, under this subsection, construct another separate building or
structure without having first obtained on his or her own behalf an appropriate residential or general contractor license or
having engaged such a duly licensed contractor to perform such work to the extent required under this chapter, or it shall
be presumed that the person, firm, or corporation did not intend such building solely for occupancy by that person and
his or her family, firm, or corporation. Further, such person may not delegate the responsibility to directly supervise and
manage all or any part of the work relating thereto to any other person unless that person is licensed under this chapter
and the work being performed is within the scope of that person's license.
In any event, however, all such work must be done in conformity with all other applicable provisions of this title, the rules
and regulation of the board and division involved, and any applicable county or municipal resolutions, ordinances, codes,
permitting, or inspection requirements.
Failure to comply with this affidavit may result in the owner being served with a stop work order or additional legal action
which may include a subpoena to attend a court hearing. ■
- ure(do no elerlinti in the prese ,otary Public)
SUBSCRIBED TO AND SWORN BEFORE ME THIS .3 I DAY OF A..)5 J S 4-v , 20 0 9 •
CltioNN,%.3 aok... •
(Seal)
NOTARY PUBLIC
I — DIANNE 4 . OTTO
My Commission Expires ° • U) 2 0 k 0 Notary Public, Chatham County, GA
1 My Commission Expires November 6, 2010 ,,
P.O. Box 2749—403 Butler Avenue,Tybee Island,Georgia 31328-2749
(912)786-4573—FAX(912) 786-9539
www.cityoftybee.org
en, 00
CITY OF TYBEE ISLAND, GEORG,LA
APPLICATION FOR BUILDING PERMIT
O
Location: 17 6'L 1 ck PIN#
NAME ADDRESS TELEPHONE
Owner 7---(t(C p. 6. 6 Ti fiZIZ 9 —2 `y
Architect 75(16.- h7'< S741_l/6�ce%
or Engineer l
Con
tract or U, & 5/1111(
(Check all that apply)
❑ Repair [�e dential El Footprint Changes
n Renovation Ingle Family ❑ Discovery
❑ Minor Addition 111 Duplex 111 Demolition
n Substantial Addition ❑ Multi-Family
❑ Other G-Ag godP ❑ Commercial
Details of Project: AdiL(() R6 CA) C4/fc).5 if&C- ."7i ,J 4
Estimated Cost of Construction: $ 17 f�
6 C)
Construction Type i (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood &Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use: 4r./'a' u /7,444 G'te'Ci'e-47t`
Remarks: 1344 J- /1 s - _� d/Lf !-i/.fit-e a. 0�_' `�' -, �
c,vtpa cacP6a
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units #Bedrooms #Bathrooms
Lot Area Living space (total sq. ft.)
#Off-street parking spaces
Trees located &listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
#Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys,heating
units,ventilation ducts, air conditioning units, elevators, and similar appurtances.
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing, Disturbance or Excavation Permits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Plat Approval
In addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Management
requirements as outlined in Chapter 5-4, Code of Ordinances.
Section 5-4-9 Prohibition provides, in part, as follows:
(4.) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person,unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed
on the affected property(prior to any development activity), and what changes in storm water
flow have occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requirements. The final
product must actually meet the City Ordinance requirements.
Applicant name: c c o \
Project I.D.:
Attachments approved by: Date:
During construction:
On-site restroom facilities will be provided through
On-site waste and debris containers will be provided by 2/7
Construction debris will be disposed by Z '7- by means of /„/ 4 it
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: �� / �� A Signature of Applicant:
S
Note: A permit ormally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: ' :ignature ate FEES
Zoning Administrator W 01 i(d Permit
Code Enforcement Officer -= r � 41 Inspections
Water/Sewer - Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
\ GIA • ss,
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition,Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have 11PD regulations that could affect the
project.
AQ' IY 09
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
"An Approved Set of Plans Must
Remain on Job Site at All Times" R1,4 e Q_ei _ _ _ _ , __.._ _---_-- -_
l ROOF FRAMING z/-6 7/0(5) id'C.,-
IRC SECT. 802 AND SSTD 10-99 SECT. 102 AND 307
ALLOWED ROOF SLOPES ARE 2112.7112 FOR WOOD
--- '-!ALL CONSTRUCTION,:AI L:HOLES-IN:HOLD pOWNS-- -_ 7:4:-:-..
:O EE FILLED USING MANUFA TUBER'S NAILS.
G (5 RC5O '
du^zS Zcie,,.
__.,..___-yor 1/2 -e/ri ' ,/1, all
1
.._
*6±..15 __
ti, c,//cJ�4.6°-_ _r/t".)/? s .! _..�_ f
KU c m :t,raps 1 ..
dequire4tot" c tig , , M....,. , "..„ - -_ .
.rt
.
/( _ 16 Grp . ,I a " To 1114 r C-7 l4ocr.s-C. Z'C'�e' x
� -
,J� Roff --- --- '_ - 'fQff < e., 4 - .! ?. 1y 0C-7'i-sr"•t• y . __..
x14-106.. Joi s+ 6y61/7-441
6 (;;T t i
_6►r4;SLE QooF 7b BE LLEL 1 __ f
og rfPR(3 Lab__S7`i2v_-7vg£ 1 /_r ,„ 84, ±/iv . J r244 ✓
64.,
004.- 00161 CotifETZ1416. efs,
'31121 14dtt b -
`REVIEW FOR CODE COMPLIANCE
1
,Oery effort has been made to identify i
de violations, no oversight by the CONSTRUCTION MUST COMPLY WITH THE A�rsewer shall be construed as authority j
tol violate, cancel, alter or set aside SS a O 10 .4q AND THE !RC ONE AND TWO
zany applicable codes or ordinances.The r n.�,±ILY DWELLING CODE �'-00!d EDITION 1
review and permit should not be construed - -
ass warranty oru rantee_. '' SL7a i3' STATE OF GEORGIA AMENDMENTS
Reviewed By 1 Date ///tj Y ;