1. CALL TO ORDER/ROLL CALL OF MEMBERS: The meeting was called to order at
6:00 p.m. Present were Councilmembers Michael W. Davey, Robert Gusman, Mayra P. Lindsay,
James S. Taintor, Vice Mayor Michael E. Kelly and Mayor Franklin H. Caplan. Councilmember
Enrique Garcia was absent. Also present were Village Manager Genaro "Chip" Iglesias and Village
Attorneys Stephen J. Helfinan and Chad Friedman.
2. PLEDGE OF ALLEGIANCE: Mayor Caplan led the Pledge of Allegiance.
Village Attorney Helfman explained the procedure for the public in regards of the hearing process.
3. BUILDING, ZONING AND PLANNING: All witnesses giving testimony in the public
hearing were sworn in by the Village Attorney.
Hearing Number SP 19, RV 32, V 1: The applicant, Consultatio Key Biscayne, LLC, 350 Ocean
Drive, is requesting the following: 1.) Approval of a site plan for 154 multifamily units; 2.)
Approval of the following variances: a. North side setback- approval of a variance to permit a North
1 of 5
August 22, 2011
side setback of 79 degrees where 63 degrees is required for floors 7 through 15; b. South side
setback- approval of a variance to permit a South side setback of 79 degrees where 63 degrees is
required for floors 7 through 15; c. Maximum floor area for rooftop structures- approval of a
variance to permit rooftop structures to have a floor area of 38% where 10% is required; and 3.)
Approval of a vacation of 57.5 feet of the Ocean Drive right-of-way.
Building, Zoning and Planning Director Jud Kurlancheek addressed the Council recommending
approval of the project subject to the following conditions: 1.) Pursuant to the Village of Key
Biscayne Master Plan and the Village Code, this approval is subject to the condition that the
necessary parks and recreation facilities of 2.5 acres per 1,000 permanent population are in place and
available either: 1) prior to the issuance of the first certificate of occupancy for the principle building
on the Property; or 2) construction of the facilities may begin up to one year after the issuance of the
first certificate of occupancy for the principle building on the Property if the facilities are subject to
a binding executed contract for the construction of the facilities to be completed within one year of
the time the certificate of occupancy is issued. For purposes of this Resolution, the term "principle
building" shall mean the 15 story residential tower in the Site Plan; 2.) A detailed landscape plan,
substantially in accordance with the Site Plan, for all landscaping for the Property shall be submitted
to and approved by the Village Building, Zoning, and Planning Director prior to the issuance of the
building permit for the principle building. In order to meet the recreational needs of younger
residents, a "tot lot" shall be included in the landscape plan. The landscaping shall thereafter be
installed and approved by the Director prior to the issuance of the first certificate of occupancy for
the principle building on the Property; 3.) A detailed plan for all pedestrian walkways (with finishes)
shall be submitted to and approved by the Village Building, Zoning, and Planning Director prior to
the issuance of the building permit for the principle building on the Property. All walkways shall be
constructed prior to the issuance of the first certificate of occupancy for the principle building on the
Property; 4.) The Applicant shall provide written documentation from the appropriate regulatory
agencies that domestic water and fire protection needs (flows) have been satisfied. This
documentation shall be approved by the Village prior to the issuance of the first building permit for
any building on the Property; 5.) The Applicant shall grant the Village, as shown on the Site Plan,
an improved 25 ft. wide publicly dedicated beach access easement, in a form acceptable to the
Village Attorney, on the north side of the Property from Ocean Drive to the public beach prior to the
issuance of the first certificate of occupancy for the principle building on the Property.
Improvements in said easement shall be constructed and maintained by the Applicant pursuant to
plans approved by the Village Building, Zoning, and Planning Director. All of the improvements
shall be constructed and approved by the Director prior to the issuance of the first certificate of
occupancy for the principle building on the Property; 6.) The Applicant shall grant to the Village,
as shown on the Site Plan, an improved 25 ft. wide publicly dedicated beach access easement, in a
form acceptable to the Village Attorney, on the south side of the Property from the East Heather
Property line to the public beach prior to the issuance of the first certificate of occupancy for the
principle building on the Property. Improvements in said easement and in the 7.5 ft. easement
adjacent to the south lot line shall be constructed and maintained by the Applicant pursuant to plans
2 of 5
August 22, 2011
approved by the Village Building, Zoning, and Planning Director. All of the improvements shall be
constructed and approved by the Director prior to the issuance of the first certificate of occupancy
for the principle building on the Property; 7.) Prior to the issuance of the building permit for the
principle building on the Property, the Applicant shall construct a six foot high finished CBS wall
or finished prefabricated concrete wall generally along the west Property line; 8.) The Applicant
shall reconstruct the improvements, including sidewalk, paving, drainage, and landscaping on
Sonesta Drive and Ocean Drive from the Property's main entrance to Crandon Boulevard. The
design of such improvements shall be submitted to and approved by the Village Building, Zoning,
and Planning Director no later than the issuance of the building permit for the principle building on
the Property. The Applicant shall construct the improvements and obtain approval by the Village
prior to the issuance of the first certificate of occupancy for the principle building on the Property;
9.) During the period of construction, Sonesta Drive shall be primarily used for construction
vehicles, deliveries, guests, and employees as the means of accessing the Property. The Village
Manager may authorize the use of East Heather Drive on those occasions when Sonesta Drive cannot
reasonably be used; 10.) During the period of construction, a six (6) ft. high construction fence with
dust screening shall be erected along each Property boundary prior to the issuance of the first
building permit and shall remain in place until the first certificate of occupancy is issued for the
principle building on the Property or other perimeter fences or walls are erected. Said fence may be
temporarily moved or removed to allow for construction of improvements or landscaping to be
placed along the Property lines as required by the approved plans or these conditions; 11.) Non-
material modifications of the Site Plan, which do not increase the density or intensity of
development, and are substantially in accordance with the Site Plan, may be administratively
approved by the Building, Zoning, and Planning Director. All other changes shall be approved by
the Village Council after a public hearing; 12.) As provided in Section 30-73(e) of the Village Code,
the approval of the Site Plan shall automatically become null and void unless the appropriate
development order has been issued within 12 months of the date that this Resolution was approved
by the Village Council; 13.) Whenever the term "approved by" or "substantially in accordance with"
is used in this Resolution said determination shall be made by the Building, Zoning, and Planning
Director in his/her reasonable discretion; 14.) The use of the temporary sales center, as shown on
Page A7.3 within the Site Plan, shall be permitted to continue until such time as the first
dwelling/residence is completed on the Property (at which time all sales activity shall be conducted
therein) but in no event later than 24 months from the effective date of this Resolution by which time
said sales center shall be removed from the Property; 15.) In the event there is damage or destruction
caused by a windstorm/hurricane event to any of the improvements or portions thereof constructed
on the Property, the improvements may be repaired/rebuilt in accordance with the Site Plan; 16.)
All residents, employees (including household employees) as well as all contract vendors and
contract service providers to the Property shall be required to utilize the Ocean Drive driveway as
the exclusive point of ingress and egress for the Property.
The Mayor opened the public hearing. John Shubin from Shubin & Bass on behalf of
Consultatio Key Biscayne, LLC; Eduardo Costantini, Chairman of Consultatio, LLC;
3 of
August 22, 2011
Bernardo Fort -Brescia with Arquitectonica; Cecilia Ward with JC Consulting, Inc; Joe
Corradino with Corradino Group; Marcos Corti-Maderna with Consultatio LLC; Manuel
Cambo, 621 Harbor Drive; Raul Llorente 345 Cypress Drive; Jose Loredo with Carlton
Fields on behalf of Red Dragon, Sands LTD, doing business as Silver Sands Beach Resort
(in opposition) and Amy Huber with Shubin & Bass addressed the Council.
There was extensive discussion from Council regarding this hearing.
The Attorney addressed the Council explaining that the Council can act on approving the site plan
and variances at the time the following resolutions are read.
4. RESOLUTIONS: The Village Attorney read the following resolution by title:
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE,
FLORIDA, APPROVING A SITE PLAN CONSISTING OF AN 154 UNIT RESIDENTIAL
DEVELOPMENT WITH ACCESSORY FACILITIES FOR PROPERTY LOCATED AT 350
OCEAN DRIVE, AS FURTHER LEGALLY DESCRIBED IN EXHIBIT "A;" PROVIDING
FOR FINDINGS; PROVIDING FOR ACCEPTANCE OF A VOLUNTARY COVENANT;
PROVIDING FOR RECORDING; PROVIDING FOR THE AFFECT ON RESOLUTION
2007-16; AND PROVIDING AN EFFECTIVE DATE.
Councilmember Davey made a motion to approve the resolution. The motion was seconded by
Councilmember Gusman.
It was the consensus of Council to add to the conditions of the site plan approval the following: All
residents, employees (including household employees) as well as all contract vendors and contract
service providers to the Property shall be required to utilize the Ocean Drive driveway as the
exclusive point of ingress and egress for the Property.
The resolution, as amended, was approved by a 6-0 roll call vote. The vote was as follows:
Councilmembers Davey, Gusman, Lindsay, Taintor, Vice Mayor Kelly and Mayor Caplan voting
Yes.
The Village Attorney read the following resolution by title:
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE,
FLORIDA APPROVING AN APPLICATION FOR A VARIANCE FROM THE SIDE
SETBACK AND ROOFTOP STRUCTURE FLOOR AREA REQUIREMENTS FOR THE
PROPERTY LOCATED AT 350 OCEAN DRIVE; PROVIDING FOR CONDITIONS; AND
PROVIDING FOR AN EFFECTIVE DATE.
4 of 5
August 22, 2011
Councilmember Taintor made a motion to approve the resolution. The motion was seconded by
Councilmember Gusman and approved by a 6-0 roll call vote. The vote was as follows:
Councilmembers Davey, Gusman, Lindsay, Taintor, Vice Mayor Kelly and Mayor Caplan voting
Yes.
The Village Attorney read the following resolution by title:
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE,
FLORIDA APPROVING AN ABANDONMENT AND VACATION OF 57.5 FEET OF THE
OCEAN DRIVE RIGHT-OF-WAY; PROVIDING FOR CONDITIONS; AND PROVIDING
FOR AN EFFECTIVE DATE.
Councilmember Davey made a motion to approve the resolution. The motion was seconded by
Councilmember Gusman.
Director Kurlancheek and Ramon Castella with C3TS addressed the Council regarding this
resolution.
The resolution was approved by a 5-1 roll call vote. The vote was as follows: Councilmembers
Davey, Gusman, Lindsay, Taintor, and Mayor Caplan voting Yes. Vice Mayor Kelly voting No.
5. ADJOURNMENT: The meeting was adjourned at 8:50 p.m
Resp lly submitte
Conchita H. Alvarez, MMC
Village Clerk
adie,
Approved this 10th d of Ja ua
Franklin H. Caplan
Mayor
2012:
IF A PERSON DECIDES TO APPEAL ANY DECISION MADE BY THE VILLAGE COUNCIL WITH
RESPECT TO ANY MATTER CONSIDERED AT A MEETING OR HEARING, THAT PERSON WILL
NEED A RECORD OF THE PROCEEDINGS AND, FOR SUCH PURPOSE, MAY NEED TO ENSURE
THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES
THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED.
5 of 5