HomeMy Public PortalAboutResolution 2020-95, A Resolution Accepting the Reconciliation of Total Quantities for the Havens Acres Roadway Rehabilitation Project(i)
RESOLUTION 2020-95
A RESOLUTION ACCEPTING THE RECONCILIATION OF TOTAL QUANTITIES FOR THE HAVENS
ACRES ROADWAY REHABILITATION PROJECT
WHEREAS, the City of Riverdale, Iowa ("City") is a Municipal Corporation, organized and
operating under the laws of the State of Iowa;
WHEREAS, the City of Riverdale entered into an agreement with MSA-PS for professional
engineering services for the milling and resurfacing of South Kensington Avenue; and,
WHEREAS, the project was let as Haven Acres Roadway Rehabilitation and was
awarded to Brandy Construction and approved February 15, 2020; and,
WHEREAS, MSA-PS is recommending final acceptance and final payment; and,
WHEREAS, MSA-PS is recommending a final payment in the amount of $1 1,340.00 (ref.
attached Exhibit "A").
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF RIVERDALE, IOWA,
Section 1. The City Council resolves that the Project has been completed and is
hereby accepted.
Section 2. the City Council of the City of Riverdale, Iowa that the reconciliation of
costs is hereby accepted, and it approves the execution of the final payment based on
the reconciliation.
Passed, approved and adopted this 8th day of December 2020.
APPROVED
ATTEST
Michael Bawden, Mayor Kati Enloe, Deputy Clerk
2117 State Street
Suite 200
Bettendorf, IA 52722
P (533) 445-3501
TF (888) 732-8321
F (583)445-3503
www.msa-ps corn
MSA
t -T.0,61 -r
November 20, 2020
Mr. Kent Royster
City Manager
City of Riverdale
110 Manor Drive
Riverdale, Iowa 52722
Re: Havens Acres Roadway Rehabilitation Project
Dear Administrator Royster:
Enclosed is the final pay application for Brandt Construction in regards to the Haven
Acres Roadway Rehabilitation Project. In summary, the pay application indicates,
that unless the City has objections that have not yet been voiced, MSA recommends
final payment to Brandt Construction in the amount of $11,340.00. Please let me
know if there are any questions.
Thank you very much for this opportunity to provide professional engineering services
to the City of Riverdale. We greatly appreciate the confidence and trust the City has
placed in MSA to perform these services.
Respectfully Yours,
MSA Professional Services, Inc.
Christian R. Cooper, P.E., CPESC.
Project Engineer
® 2020 MSA Professional Services
G110\10876\ 10876067\ Project Management110876067 201120 Project Close Out docx
To (Owne r): CITY OE itWFRDALE
Projec t: HAV EN S A CRES RO AD WAY REHA BILITATION
Own er's Con tr act No. . N/A
A pplica tio n Period: 5/22/2020 -10/29/2020
From (Con tractor): BRANDT CONS T
Co ntra ctor's Applica tion Fo r Payment No . 2
Application Date: 11/17/2020
Contra ct: 10876067
Notice to Pro ceed Date: Febru ary 18, 2020
MSA PRO FESSIONA L SERVICES, CNC.
Engineer's Project No. : 10876067
Con tractor's Pro ject No .:
Application for Paymen t
Change Order Surorn
Appro ve d C han ge Orders
Number
A dditio ns
Deductio ns
1
$1,450.00
2
$1,600. 00
3
$3,652. 75
TOTA LS
NET CHANGE BY
C HANGE ORDERS
$5,102.75
$1,600.00
$3,502. 75
Contra ctor's Certificatio n
The undersigned Co ntractor certifies that: (1) all previo us progress payments re ceived
fro m O wner on accoun t of Work don e under the Co ntract have been applied on account
to discharge Con tractor's le gitimate obligation s in curred in co nn ection with Work
co vered by prior Applicatio ns for Payment; (2) title of all Work, materials and
equipmen t inco rpo ra ted in sa id Work or otherwise listed in or cove red by this
Application for Payment will pass to Owner at time of payment free and clea r of all
Liens, sec urity interests and encumbrances (ex cept such as are covered by a Bond
ac ceptable to Own er indemnifying Owner again st any su ch Liens, secu rity interest or
encumbra nces); and (3) all Work cov er ed by this Applica tion fo r Payment is in
acco rdan ce with the Contract D ocuments an d is n ot defective_
I
'Date :
//—i Z° Ze
1. O RIGINAL CONTRACT PR ICE
2. N et change by C han ge O rders
3. CURRENT CO NTR ACT P RICE (Lin e 1 ± 2)
4. TO TAL C OMPLETED A ND STORED TO DATE
(Column G on Pro gress Estimate)
5. RETAINAGE:
a. 0 % x S 167,969. 44
b. % x S Stored Material
c. T otal Retaina ge (Line 5a + Line 5b)
6. AMOUNT ELIGIBLE TO D ATE (Lin e 4 - Line 5c)
7. LESS PREV IOUS PAYMENTS (Lin e 6 fro m prior Applic ation)
8. AMOUNT DUE THIS APPLICA TION
9. BAL ANCE TO FIN ISH, PLUS RET AINAGE
(Co lumn I on Pro gress Estimate + Line 5 above)
Payment of:
is reco mmended by:
Payment of
is appr oved by:
Appr oved by:
511 ,340 .00
(Line 8 or oth er - at explanation of other am ount)
F unding Agency (if applicable)
(Engi e?
S
5
S
S
S
S
5
1;
S
S
$223,881 .00
3,502 .75
$227.383.75
$227,383.75
$0.00
$0.00
$227,383 .75
216,043.75
$11,340 .00
$0.00
(Dat e)
e 26=O
(Date)
(Date)
EJC DC No . C-620 (2007 Editio n)
Prepared by the En gineer s' Jo int Contract Do cu ments Co mmittee and e nd orsed by th e Associated Ge neral C ontract ors of Americ a and the Constructio n Specific ations Institute . Page I of 2
00 62 76-1
10876067 200713 Pay Application 2
Progress Estimate
For
(contr act): Hav en Auer: Roa dwa y Re bateMame
Applcatioo
Application Nu mber: 2
Period: 5/22/2020 - 10292020
Applic ation [)ate : 11/172020
A
Item
a
C D E
F
G H
1
Bid
Un its
Un it
Price
Bid
Va lue
Work Completed
Materials pres ently
To ta l C omple te d and Stored to Da te
Bid Ite m
N o.
De scription
Quan tity
From Previous
Application
Quantity this
Period
Value this
Application
Store d
(no t in C or E)
$
(C + E - 9
%
(G / B)
Balance to Finish
G)
1.
2
Traffic Mainte nance -SU DA3 8030.104
Traffic Maintenance-TC 419
I
LS
$3,500.00
$3, 500.00
53,500.00
0.00
$0.00
$0.00
53,500.00
100.0°/
(B -
50.00
3.
Abando n San ita ryCleano ut
1
LS
$2,000. 00
52,000.00
$2,000.00
0.00
50.00
50.00
52, 000.00
100.0%
$0.00
4.
Sa wcut Breako ut Lin e
I
EA
51, 100.00
51,100.00
51, 100.00
0.00
50.00
50.00
51, 100.00
100.0%
$0.00
655
FT
55.00
53,275.00
$3,275.00
0.00
50.00
50.00
$3,275.00
100.0%
$0.00
5.
Sawc ut Curb Cut
533
FT
$25.00
$13,325.00
513,325.00
0.00
50.00
50.00
$13,325.00
100.0%
5 000
6.
7.
Sa wcut Cur b a nd Gutter
Remove Cu rb G utter
0
FT
$11. 00
$0.00
50.00
0.00
50. 00
50.00
50.00
100.0%
S0.00
8.
and
Driveway Pav ement Re mo val
0
FT
530.00
50.00
$0.00
0.00
S0. 00
50.00
50.00
100.0%
50 .00
9.
Pavemen t Re moval, Milling- 1.75"
313
SY
540.00
$12,520. 00
$12,520.00
0.00
50.00
$0.00
$12,520.00
100.0%
50.00
10.
Paveme nt R emoval, Milling 2"
4,908
SY
$3.50
$17,178.00
$17,178.00
0.00
50.00
50.00
$17,178.00
100.0%
S0.00
11.
-
Grind Butt Join t
211
SY
515.00
53,165.00
$3,165.00
0.00
50.00
$0.00
53,165.00
100.0%
$0 .00
12.
1.3_
Cu rb and Gutter, Special
PCC Driveway, 6"
170
0
LF
LF
$10.00
5115.00
$1,700.00
50.00
51,700.00
50.00
0.00
0. 00
50.00
50.00
50.00
50.00
51,700.00
$0.00
100 .0%
100.0%
50.00
$0.00
14,
Fu rn ish Manho le Ca stings, SW
303
SY
562.00
518,786.00
$15, 810.00
0.00
$0.00
$0.00
515,810 .00
100.0%
50.00
15.
-601
Exte rior Chimney Se al
8
EA
$1,000.00
58,000.00
58,000.00
0.00
50.00
50.00
$8,000.00
100.0%
50.00
16.
17.
Granular Subbase , 10"
Granu la r Subbase , 6"
8
66
EA
TON
$625.00
552.00
$5,000.00
53,447.60
50.00
53,447. 60
0.00
0.00
$0.00
$0.00
$0.00
$0.00
$5,000.00
53,447.60
100.0%
100.0%
50.00
50.00
91.4
TON
$57.00
$5,209.80
$5,209.80
0.00
$0.00
50 .00
$5,209.80
100.0%
$0.00
18.
Class 13 Excavation
23
CY
$35. 00
$805.00
5805.00
0.00
50.00
50 .00
5805.00
100.0%
S0.00
19.
Cla ss 10 Excavation
100
CY
$35.00
$3,500. 00
$3,500.00
0.00
$0.00
50.00
53 ,500.00
100.0%
50.00
20.
V alve Box Adjustment Riser, 1"
1
EA
$400.00
$400.00
$2,000.00
0.00
50.00
50.00
$2,000.00
100.0%
50.00
21.
22.
Valve Box Adjustme nt Rise r, 4"
Wate r Mete r Box , Modified
1
EA
$400. 00
5400.00
$400.00
0 .00
50.00
$0.00
5400.00
100.0%
50 .00
23.
Schedu le 80 PVC , 6"
3
EA
$1,500.00
54,500. 00
$4,500.00
0.00
50 .00
$0.00
54,500.00
100.0%
50.00
24.
PV C A ssembly
210
LF
541.00
58,610. 00
$8,610.00
0.00
50.00
50.00
$8,610.00
100.0%
$0.00
25.
Co nn ect D rain line to Ext's Stru cture
4
EA
$1, 000.00
54,000.00
$4,000.00
0.00
$0.00
$0.00
$4,000.00
100 .0%
S0.00
26.
Ar ea Intake with Gra te, 2' Dia
3
EA
$530.00
$1,590.00
$1,590.00
0.00
$0.00
50.00
51,590.00
100.0%
$0.00
27.
Intake To p Remo va l
I
EA
$1,500.00
$1, 500.00
$1 ,500.00
0.00
50.00
50.00
$1,500.00
100.0%
50.00
28.
in take Tops
6
LA
$550.00
$3,300.00
$3,300.00
0.00
50 .00
50.00
53 ,300.00
100.0%
50.00
29.
Class I or Class II Backfill
170
SF
$70.00
$11,900.00
511,900.00
0.00
50.00
$0 .00
$11,900.00
100.0%
$0.00
30.
Asphalt Ove rlay Fabric
0
TON
515.00
$0.00
50.00
0.00
50 .00
50.00
$0.00
100.0%
50.00
31.
32.
HMA LT Su rface, 1/2" PG 58-28S
Tackcoat
4, 908
621.6
SY
TON
54.00
92
$19,632 .00
S57,187.20
$19,632.00
557,187.20
0.00
0 .00
50.00
$0.00
$0 .00
50.00
$19,632.00
557 ,187.20
100.0%
100.0%
50.00
$0.00
33.
Offsite Topsoil
1, 141.5
GAL
50.10
$114.15
$114.15
0.00
$0.00
50 .00
$114.15
100.0%
$0 .00
34.
Type 1 Se ed Mixtur e
250
SY
58.00
52,000.00
50.00
0.00
50.00
50.00
50.00
100 .0%
50.00
35.
Mo bilization
263
SY
$3.00
$789.00
$0.00
0 .00
$0.00
50.00
$0 .00
100.0%
50.00
I
Items 1-35
1
LS
$7,500.00
$7,500.00
$7,500.00
0.00
50.00
50.00
57,500 .00
100.0%
$0.00
5225.933.75
5216 .768.75
0.00
50.00
5221,768.75
50.00
Chan ge Order Number 1
1
LS
$I,450.00
$1,450.00
51,450.00
0 .00
50.00
50.00
51,450.00
100 .0%
50 .00
i
SO
i
A
A
00
Total
5227,383 .75
5218,218.75
50.00
$223,218 .75
50.00
FJC DC No. C-62012007 Edhinal
Pre pare d by the EsSineera' Joint Contra ct D ocuments Committee sad =domed by the Associated Ge neral. Cont ract or s of Americ a and th e C onstruction Spedllemti om I.i dtute
P age 2 .02
00 62 76-2
10876067 200713 Pay Application 2 Progress Estimate